DEVFLOW: Agent Development
5-phase workflow for coordinated multi-agent development.
⚠️ MANDATORY: 100% Issue/Task Coverage
Every phase must verify that 100% of original issue/task requirements are being addressed.
- Phase 1: Extract ALL requirements from original issue
- Phase 2: Dispatch agents with complete requirement lists
- Phase 3: Review must verify 100% coverage before quality check
- Phase 5: Cannot merge until 100% of original requirements implemented
Incomplete implementations = SEND BACK, do not proceed.
Phase 1: Oracle Assessment
- Assess codebase state with Oracle
- Identify completed work, remaining work, dependencies
- Extract ALL requirements from original issue/task (
gh issue view <number>) - Break down into parallelizable tasks ensuring ALL requirements are covered
Phase 2: Parallel Implementation
Dispatch Docker agents:
- Clone repo, format locally (
cargo +nightly fmt) - Branch as
feat/nameorfix/name - Open PR to correct base branch with
Closes #Xin body - Never push to existing branches
PR MUST include issue links:
Closes #XorFixes #Xfor issues being addressed- "Related Issues" section in PR body
- Verify:
gh pr view --json closingIssuesReferences
Phase 3: Ultra-Critical Review
After CI passes, run 6-pass review:
| Pass | Focus |
|---|---|
| 0.5 | 100% issue/task coverage verification (MANDATORY FIRST) |
| 1 | Runtime/compile failures |
| 2 | Patterns, imports, dead code |
| 3 | Abstractions, hard-coded values |
| 4 | Environment compatibility |
| 5 | Verification commands |
| 6 | Context synthesis |
CRITICAL: Pass 0.5 (issue coverage) MUST pass before proceeding. If coverage < 100%, send agent back immediately.
Review Escalation
- Escalate to coordinator first — Architecture/tradeoff questions
- Coordinator applies good judgment — Based on codebase patterns
- Escalate to human when needed — Significant risk or uncertainty
Review Timing
- Pre-PR review: After agent work, before PR creation
- Post-PR review: After PR creation, before merge
Phase 4: Human Approval
Pause for: PR approval, complex decisions requiring human judgment.
Continue through: workstream setup, agent dispatch, CI fixes, review feedback.
Phase 4.5: FINAL COVERAGE GATE
MANDATORY: Before any merge, perform LINE-BY-LINE requirement verification.
# Extract ALL requirements from issue
gh issue view <number> --json body --jq '.body' | grep -E "^\- \["
gh issue view <number>
Create verification table:
| Requirement | Status | Evidence |
|-------------|--------|----------|
| [from issue] | ✅ | `file:line` |
| [from issue] | ❌ MISSING | Not in PR |
| [from issue] | ⚠️ PARTIAL | [what's missing] |
**Honest Assessment**: X% (Y of Z requirements)
| Coverage | Action |
|---|---|
| 100% | ✅ Proceed to merge |
| < 100% | ❌ Return to Phase 2 with line-by-line gap list |
Phase 5: Merge & Continue
Before merge, verify issue linking:
gh pr view <NUMBER> --json closingIssuesReferences
# Must show linked issues - if empty, send back to fix
Merge PRs in dependency order. Only after Final Coverage Gate passes AND issues are linked. Issues auto-close on merge.
Mermaid Diagrams in Reviews and PRs
Reviews and PRs SHOULD include Mermaid diagrams when changes involve flows, states, or architecture.
| Change Type | Diagram |
|---|---|
| Flow change | flowchart before/after |
| API modification | sequenceDiagram |
| State handling | stateDiagram-v2 |
| Architecture change | flowchart with subgraphs |
Example in review:
### New Token Flow
```mermaid
sequenceDiagram
Client->>Server: Request (expired token)
Server-->>Client: 401 + refresh
Client->>Server: New request
```
Anti-Patterns
| Wrong | Right |
|---|---|
| Merge with incomplete coverage | 100% of issue requirements implemented first |
| PR without issue links | Every PR has Closes #X for related issues |
| Push to branch | Feature branch + PR |
| Checkbox review | 6-pass analysis (starting with coverage check) |
| Coordinator implements | Dispatch agents |
| Pause every step | Pause for PR decisions |
| Skip CI | Wait for CI |
| "Core requirements done" | ALL requirements done, no exceptions |
| Merge then close issue manually | Use Closes #X for auto-close on merge |
| Text-only complex changes | Mermaid diagrams for flows/states |