CA Lobby Phase Planning
Project Configuration
CA Lobby Specific Paths:
- PROJECT_MASTER_PLAN_PATH:
Documentation/General/MASTER_PROJECT_PLAN.md - PROJECT_DOCS_PATH:
Documentation/PhaseX/Plans/ - PROJECT_PHASE_FORMAT:
PHASE_[X]_[NAME]_PLAN.md - PROJECT_REPORT_PATH:
Documentation/PhaseX/Reports/
CA Lobby Specific Requirements
Additional Sections (Beyond Generic 10)
Demo Data Considerations
- Impact on demo mode vs backend mode
- Sample data generation requirements
- REACT_APP_USE_BACKEND_API flag considerations
Vercel Deployment Impact
- Build size implications
- Environment variable changes needed
- Deployment testing strategy
BigQuery Integration Points
- Backend API changes required
- Data service modifications
- BLN API schema considerations
Clerk Authentication Implications
- User management impact
- Authentication flow changes
- Role/permission updates
CA Lobby Phase Planning Steps
Step 1: MANDATORY Master Plan Consultation
CRITICAL: Always read Documentation/General/MASTER_PROJECT_PLAN.md FIRST
Verify:
- Current project phase and status
- Previous phase completion
- Prerequisites met
- Dependencies resolved
Step 2: Verify Previous Phase Completion Report
Location: Documentation/PhaseX/Reports/
Check:
- Previous phase has completion report
- Report includes all 12 required sections (CA Lobby specific)
- Master plan updated with previous phase status
If Missing: → BLOCK: "Previous phase missing completion report. Must create completion report before planning new phase."
Step 3: Load CA Lobby Phase Plan Template
Use generic template + CA Lobby sections (11-14 above)
Step 4: Gather Phase Information
Standard generic collection + CA Lobby specifics:
- Demo data impact
- Vercel deployment considerations
- BigQuery/backend changes
- Clerk authentication impact
Step 5: Define Micro Save Points
CA Lobby standard: 30-45 minute increments
Format: MSP-[Phase].[Number]: Description
Example: MSP-2g.1: Create component structure
Step 6: Write Phase Plan
Location: Documentation/Phase[X]/Plans/PHASE_[X]_[NAME]_PLAN.md
Example: Documentation/Phase2/Plans/PHASE_2G_VISUALIZATION_PLAN.md
Step 7: Update Master Plan Reference
Add phase to master plan's phase list with status: 🔄 IN PROGRESS
CA Lobby Integration Points
Triggers After:
- completion-report skill (verifies previous phase complete)
Triggers Before:
- Implementation begins
Works With:
- Master plan update workflows
- Documentation structure
Example Usage
User Says:
"Let's start planning Phase 2g for enhanced visualizations"
Skill Executes:
- Reads
Documentation/General/MASTER_PROJECT_PLAN.md - Verifies Phase 2f.2 complete with completion report
- Loads CA Lobby phase plan template (14 sections)
- Gathers Phase 2g information:
- Objectives: Enhanced visualization with charts
- Deliverables: Recharts integration, activity timeline
- Demo data: Ensure charts work with sample data
- Vercel: Monitor bundle size impact
- BigQuery: No backend changes needed
- Clerk: No auth changes needed
- Creates micro save points (30-45 min each)
- Writes to
Documentation/Phase2/Plans/PHASE_2G_ENHANCED_VISUALIZATION_PLAN.md - Updates master plan with new phase status
Notes
- MANDATORY: Always consult master plan FIRST
- MANDATORY: Verify previous completion report exists
- CA Lobby Standard: 12-section completion reports (not generic 10)
- CA Lobby Standard: Demo data must be considered in all phases
- Micro Save Points: 30-45 minute increments (CA Lobby commitment strategy)
Changelog
Version 1.0.0 (2025-10-20)
- Initial CA Lobby implementation
- Extends generic-skills/phase-planning
- Adds CA Lobby 14-section requirements
- Enforces master plan consultation
- Verifies completion report from previous phase
End of Skill