Acceptance Testing
Product owner verifies each acceptance criterion is met.
Prerequisites
Before starting:
- Developer verification is complete
- Story log shows "Pending Product Owner Review"
- Implementation is accessible (local, deployed, or via PR)
Testing Process
1. Locate Story Log
Find the story document:
ls docs/stories/**/*.story.md
2. Review Acceptance Criteria
Read through all criteria to understand scope.
3. Test Each Criterion
For each acceptance criterion:
Criterion [N] of [Total]:
Given: [precondition]
When: [action]
Then: [expected result]
Steps to verify:
1. [Setup step]
2. [Action step]
3. [Verification step]
Result: [ ] Pass [ ] Fail [ ] Blocked
Notes: _______________
4. Record Results
If PASS: Check the criterion's checkbox in the story log
If FAIL:
- Do not check the checkbox
- Add note describing the failure
- Specify what needs to be fixed
If BLOCKED:
- Note the blocker
- Determine if it's a missing prerequisite or external dependency
5. Update Story Status
All criteria pass:
### Acceptance Checks
**Status: Accepted**
All acceptance criteria verified and passing.
Tested on: [date]
Any criteria fail:
### Acceptance Checks
**Status: Needs Revision**
Failing criteria:
- Criterion 2: [description of failure]
Required fixes:
- [Specific fix needed]
After Acceptance
- Story can proceed to final commit/push/merge
- Update epic progress table if part of an epic
- Celebrate the completed increment of user value