name phase-planning
description Generate 5-phase implementation plan with validation gates and resource allocation. Adapts phase count and timeline based on complexity score. Includes validation gates between phases. Use when: planning implementation, need structured timeline, want validation checkpoints.
skill-type PROTOCOL
shannon-version >=4.0.0
mcp-requirements [object Object]
allowed-tools Read, Serena

Phase Planning Skill

Overview

The phase-planning skill generates structured, complexity-adaptive implementation plans using a 5-phase framework with validation gates. It adapts phase count and timeline distribution based on project complexity, ensuring appropriate rigor for simple scripts through critical systems.

When to Use

Use this skill when:

  • Planning implementation after spec analysis complete
  • Need structured timeline with validation checkpoints
  • Want systematic progression with quality gates
  • Require resource allocation and effort distribution
  • Have complexity score from spec-analysis (0.0-1.0)

DO NOT use when:

  • No spec analysis available (run @spec-analysis first)
  • Ad-hoc tasks without formal planning needs
  • Quick experiments or prototypes

Core Competencies

  1. Complexity-Adaptive Planning: Automatically adjusts phase count (3-6 phases) based on complexity score, ensuring appropriate rigor without over-engineering
  2. Timeline Distribution: Calculates optimal time allocation per phase using algorithmic formula with complexity and domain-based adjustments
  3. Validation Gates: Defines explicit success criteria between phases to prevent downstream failures and ensure quality progression
  4. Wave Coordination: Maps parallel execution patterns to phases for multi-agent coordination when complexity >=0.5
  5. Serena Integration: Persists phase plans to memory for cross-session retrieval and wave agent coordination

Inputs

Required:

  • complexity_score (float 0.0-1.0): Complexity score from spec-analysis
  • spec_analysis_result (object): Complete spec analysis including domain breakdown, features, timeline constraints
  • project_name (string): Name of project for phase plan identification

Optional:

  • timeline_constraint (string): Total available timeline (e.g., "40 hours", "2 weeks")
  • domain_preferences (object): Override domain-based timeline adjustments
  • custom_phases (array): Custom phase definitions for non-standard workflows

Anti-Rationalization (From Baseline Testing)

CRITICAL: Agents systematically rationalize skipping or adjusting phase planning patterns. Below are the 4 most common rationalizations detected in baseline testing, with mandatory counters.

Rationalization 1: "Let's skip to waves, phases are redundant"

Example: User says "Let's create the wave execution plan" → Agent responds "That wave structure looks reasonable..." and skips phase planning entirely

COUNTER:

  • NEVER skip phase planning when user jumps to waves
  • ✅ Phases structure work; waves coordinate agents
  • ✅ Phases MUST come before waves (phases define WHAT, waves define WHO)
  • ✅ If user suggests waves first, respond: "First we need phase planning to structure the work, THEN we can create waves"

Rule: Phases always precede waves. No exceptions.

Rationalization 2: "3 phases work for everything, keep it simple"

Example: User says "Let's use Setup-Build-Deploy for this 0.72 complexity project" → Agent responds "That simplified structure makes sense..."

COUNTER:

  • NEVER accept 3-phase template for complex projects
  • ✅ Complexity score determines phase count (algorithm, not preference)
  • ✅ 0.70-0.85 complexity REQUIRES 5 phases + extended gates
  • ✅ Simplification bias under-estimates effort by 40-60%
  • ✅ "Keep it simple" means follow the algorithm, not skip rigor

Rule: Apply complexity-based adaptation. Simple ≠ fewer phases for complex work.

Rationalization 3: "Validation gates are overhead, team will coordinate naturally"

Example: User says "We don't need formal gates" → Agent creates phases without validation criteria

COUNTER:

  • NEVER omit validation gates to reduce "overhead"
  • ✅ Gates prevent downstream failures (catch issues early)
  • ✅ "Natural coordination" = unvalidated assumptions = technical debt
  • ✅ Gates take 5-10 minutes to define, prevent hours of rework
  • ✅ Every phase transition MUST have explicit success criteria

Rule: Every phase MUST have validation gate. Not optional.

Rationalization 4: "Timeline percentages feel wrong, adjust them"

Example: User says "20% for setup feels too long" → Agent adjusts to 5% based on intuition

COUNTER:

  • NEVER adjust timeline distribution based on "feeling"
  • ✅ Percentages are algorithmic (complexity + domain adjustments)
  • ✅ If percentages feel wrong, the algorithm is right
  • ✅ "Feels too long" often means under-estimating hidden complexity
  • ✅ Only recalculate if you find FORMULA ERROR (wrong calculation, wrong weights)

Rule: Follow timeline distribution formula. Intuition doesn't override math.

Detection Signal

If you're tempted to:

  • Skip phases and go to waves
  • Use 3 phases regardless of complexity
  • Omit validation gates
  • Adjust timeline percentages subjectively

Then you are rationalizing. Stop. Follow the protocol. Apply the algorithm.


Core Algorithm

5-Phase Framework

Phase 1: Foundation & Setup (10-20% timeline)
├─ Infrastructure, tooling, environment
├─ Project scaffolding, dependencies
└─ Initial configuration

Phase 2: Core Implementation (30-40% timeline)
├─ Primary functionality
├─ Core algorithms and logic
└─ Essential features

Phase 3: Integration & Enhancement (20-30% timeline)
├─ Service integration
├─ Advanced features
└─ Cross-component functionality

Phase 4: Quality & Polish (15-25% timeline)
├─ Testing (NO MOCKS)
├─ Performance optimization
└─ Code refinement

Phase 5: Deployment & Handoff (10-15% timeline)
├─ Production deployment
├─ Documentation
└─ Knowledge transfer

Complexity-Based Adaptation

Simple (0.00-0.30): 3 phases

Phase 1: Setup & Core (30%)
Phase 2: Features & Testing (50%)
Phase 3: Deploy (20%)

Moderate (0.30-0.50): 3-4 phases

Phase 1: Setup (20%)
Phase 2: Implementation (45%)
Phase 3: Testing (25%)
Phase 4: Deploy (10%)

Complex (0.50-0.70): 5 phases (standard)

All 5 phases with standard distribution

High (0.70-0.85): 5 phases + extended

All 5 phases + extended validation gates
+ Risk mitigation checkpoints
+ Progress review gates

Critical (0.85-1.00): 5 phases + risk mitigation

All 5 phases + risk mitigation phases
+ Extensive validation gates
+ Architecture review gates
+ Security review gates
+ Performance validation gates

Workflow

Phase 1: Context Loading

  1. Retrieve Spec Analysis

    • Action: Read from Serena memory or specification document
    • Tool: read_memory("spec_analysis") or Read
    • Output: Complexity score, domain breakdown, total timeline
  2. Extract Key Parameters

    • Action: Parse complexity score, domain percentages, timeline constraints
    • Validation: Verify complexity score is 0.0-1.0, domains sum to 100%
    • Output: Validated input parameters

Phase 2: Phase Structure Determination

  1. Calculate Phase Count

    • Action: Apply complexity-based algorithm to determine 3-6 phases
    • Tool: Python calculation or algorithmic decision tree
    • Output: Integer phase count (3-6)
  2. Select Phase Pattern

    • Action: Choose phase template based on complexity band
    • Validation: Verify pattern matches complexity requirements
    • Output: Phase structure (Simple/Moderate/Complex/High/Critical)

Phase 3: Timeline Distribution

  1. Calculate Base Percentages

    • Action: Apply standard 5-phase distribution (15%, 35%, 25%, 20%, 5%)
    • Tool: Mathematical calculation
    • Output: Base timeline percentages
  2. Apply Complexity Adjustments

    • Action: Adjust percentages based on complexity score
    • Formula: Simple (+5% setup), Complex (+5% planning, -5% impl), High (+10% planning), Critical (+15% planning)
    • Output: Complexity-adjusted percentages
  3. Apply Domain Adjustments

    • Action: Adjust based on dominant domains (Frontend-heavy, Backend-heavy, Database-heavy)
    • Formula: Frontend >50% (+5% Phase 2, +5% Phase 4, -10% Phase 5)
    • Output: Final timeline distribution summing to 100%

Phase 4: Validation Gate Definition

  1. Define Per-Phase Criteria

    • Action: Specify success criteria for each phase transition
    • Tool: Template-based generation with domain customization
    • Output: Validation checklist per phase
  2. Verification Method

    • Action: Define how to verify each criterion
    • Output: Verification procedures (tests, reviews, checks)

Phase 5: Wave Mapping (if complexity >=0.5)

  1. Determine Parallelization Pattern

    • Action: Identify which phases can use parallel wave execution
    • Trigger: Multiple domains >=30%, complexity >=0.5
    • Output: Wave pattern (Two Parallel + Integration or Three Parallel + Integration)
  2. Map Waves to Phases

    • Action: Assign domain-specific agents to parallel waves
    • Output: Wave execution plan for Phase 2/3

Phase 6: Document Generation & Storage

  1. Generate Phase Plan Document

    • Action: Populate template with calculated values
    • Tool: Write Markdown structure
    • Output: Complete phase plan in Markdown format
  2. Store in Serena Memory

    • Action: Persist to Serena for cross-session retrieval
    • Tool: write_memory("phase_plan", plan_object)
    • Output: Memory storage confirmation

Implementation Protocol

Step 1: Load Context

REQUIRED INPUTS:
1. read_memory("spec_analysis") - Get complexity score
2. read_memory("8d_assessment") - Get domain breakdown
3. Current specification document
4. Project timeline constraints

EXTRACT:
- Complexity score: [0.0-1.0]
- Total timeline: [hours/days]
- Domain percentages: {frontend, backend, database, ...}
- Critical requirements: [list]

Step 2: Determine Phase Structure

def determine_phase_count(complexity: float) -> int:
    if complexity < 0.30:
        return 3  # Simple
    elif complexity < 0.50:
        return 4  # Moderate (3-4 flexible)
    elif complexity < 0.70:
        return 5  # Complex
    elif complexity < 0.85:
        return 5  # High (+ extended gates)
    else:
        return 6  # Critical (+ risk mitigation)

Step 3: Calculate Timeline Distribution

Standard 5-Phase Distribution:

Phase 1: 15% (10-20% range)
Phase 2: 35% (30-40% range)
Phase 3: 25% (20-30% range)
Phase 4: 20% (15-25% range)
Phase 5: 5% (10-15% range)

Complexity Adjustments:

Simple (0.00-0.30):
  Phase 1: +5% (more setup proportionally)
  Phase 2: +10% (straightforward implementation)
  Phase 3: -15% (less integration complexity)

Complex (0.50-0.70):
  Phase 1: +5% (more planning needed)
  Phase 2: -5% (parallel execution helps)
  Phase 3: +5% (more integration work)
  Phase 4: -5% (offset)

High (0.70-0.85):
  Phase 1: +10% (extensive planning)
  Phase 2: -10% (higher coordination overhead)
  Phase 3: +5% (complex integration)
  Phase 4: +5% (rigorous testing)

Critical (0.85-1.00):
  Phase 1: +15% (exhaustive planning)
  Phase 2: -15% (very high coordination)
  Phase 3: +5% (critical integration)
  Phase 4: +10% (extensive testing)
  Phase 5: +5% (careful deployment)

Domain-Based Adjustments:

If Frontend-Heavy (>50%):
  Phase 2: +5% (UI work time-consuming)
  Phase 4: +5% (E2E testing)
  Phase 5: -10% (static hosting simpler)

If Backend-Heavy (>50%):
  Phase 1: +5% (API design critical)
  Phase 4: +5% (integration testing complex)
  Phase 2: -10% (offset)

If Database-Heavy (>30%):
  Phase 1: +5% (schema design critical)
  Phase 2: -5% (offset from Phase 1)

Step 4: Define Validation Gates

Phase 1 → Phase 2 Gate:

Criteria:
☐ Requirements fully documented
☐ Technical approach confirmed
☐ All dependencies identified
☐ Environment setup complete
☐ No blocking unknowns

Verification:
- Review requirements.md completeness
- Verify all MCPs installed
- Confirm technical stack validated
- Check for unresolved questions

Phase 2 → Phase 3 Gate:

Criteria:
☐ Core functionality complete
☐ Unit tests passing
☐ Code review completed
☐ Performance acceptable
☐ No critical bugs

Verification:
- Run test suite (100% pass required)
- Execute code quality checks
- Measure performance benchmarks
- Review bug tracker

Phase 3 → Phase 4 Gate:

Criteria:
☐ All integrations working
☐ Advanced features complete
☐ Integration tests passing
☐ API contracts validated
☐ Cross-component flows verified

Verification:
- Test all service integrations
- Verify API endpoint responses
- Check data flow end-to-end
- Validate authentication/authorization

Phase 4 → Phase 5 Gate:

Criteria:
☐ All tests passing (NO MOCKS)
☐ Code coverage >= 80%
☐ Performance optimized
☐ Documentation complete
☐ Security audit passed

Verification:
- Run full test suite
- Generate coverage report
- Execute performance benchmarks
- Review security checklist
- Verify documentation completeness

Phase 5 → Complete Gate:

Criteria:
☐ Deployed to staging
☐ Smoke tests passing
☐ Deployment docs complete
☐ Handoff checklist complete
☐ Production-ready

Verification:
- Test staging environment
- Run smoke test suite
- Review deployment guide
- Complete knowledge transfer

Step 5: Create Wave Mapping (Phase 3)

Determine Parallelization:

IF complexity >= 0.5 AND multiple domains >= 30% THEN:
  Use parallel wave execution

Wave Pattern 1 (Two Parallel + Integration):
  Wave 3a: Frontend (parallel)
  Wave 3b: Backend + Database (parallel)
  Wave 3c: Integration (sequential)

Wave Pattern 2 (Three Parallel + Integration):
  Wave 3a: Frontend (parallel)
  Wave 3b: Backend (parallel)
  Wave 3c: Database (parallel)
  Wave 3d: Integration (sequential)

Wave Pattern 3 (Sequential):
  Wave 3a: All implementation (sequential)

Step 6: Generate Phase Plan Document

Output Structure:

# Implementation Plan: [Project Name]

## Executive Summary
- Complexity Score: [0.0-1.0]
- Phase Count: [3-6]
- Total Timeline: [X hours/days]
- Parallelization: [Yes/No]

## Phase Breakdown

### Phase 1: Foundation & Setup ([X%] - [Y hours])
**Objectives**:
- [Objective 1]
- [Objective 2]

**Key Activities**:
1. [Activity 1] (Z% of phase)
2. [Activity 2] (W% of phase)

**Deliverables**:
- [Deliverable 1]
- [Deliverable 2]

**Validation Gate**:
☐ Criteria 1
☐ Criteria 2

**Estimated Duration**: [X hours]

[Repeat for all phases...]

## Risk Mitigation (Critical/High only)
[Risk mitigation phases/checkpoints]

## Success Metrics
- Timeline adherence: ±[X]%
- Quality gates: 100% pass rate
- Test coverage: >= 80%

Step 7: Store in Serena Memory

write_memory("phase_plan", {
  project_name: string,
  complexity_score: float,
  phase_count: int,
  total_timeline: string,
  phases: [
    {
      number: int,
      name: string,
      percentage: float,
      duration: string,
      objectives: string[],
      activities: string[],
      deliverables: string[],
      validation_criteria: string[]
    }
  ],
  wave_plan: {
    enabled: boolean,
    pattern: string,
    waves: Wave[]
  },
  risk_mitigations: RiskMitigation[],
  created_at: timestamp
})

Outputs

Structured output object:

{
  "project_name": "string",
  "complexity_score": "float (0.0-1.0)",
  "phase_count": "int (3-6)",
  "total_timeline": "string (e.g., '40 hours', '2 weeks')",
  "interpretation_band": "Simple | Moderate | Complex | High | Critical",
  "phases": [
    {
      "number": "int",
      "name": "string",
      "percentage": "float (sums to 100%)",
      "duration": "string",
      "objectives": ["objective1", "objective2"],
      "activities": ["activity1", "activity2"],
      "deliverables": ["deliverable1", "deliverable2"],
      "validation_criteria": ["criterion1", "criterion2"]
    }
  ],
  "wave_plan": {
    "enabled": "boolean",
    "pattern": "Sequential | TwoParallel | ThreeParallel",
    "waves": [
      {
        "wave_id": "string",
        "phase": "int",
        "agents": ["agent1", "agent2"],
        "execution": "parallel | sequential"
      }
    ]
  },
  "domain_adjustments": {
    "frontend_adjustment": "string",
    "backend_adjustment": "string",
    "database_adjustment": "string"
  },
  "created_at": "ISO timestamp"
}

Markdown Document: Complete phase plan document saved to:

  • Serena memory: phase_plan_{project_name}
  • Local file: PHASE_PLAN.md (optional)

Success Criteria

This skill succeeds if:

  1. Phase count is algorithmically correct

    • Complexity 0.00-0.30 → 3 phases
    • Complexity 0.30-0.50 → 3-4 phases
    • Complexity 0.50-0.70 → 5 phases
    • Complexity 0.70-0.85 → 5 phases + extended gates
    • Complexity 0.85-1.00 → 5-6 phases + risk mitigation
  2. Timeline percentages sum to exactly 100%

    • No rounding errors
    • All adjustments accounted for
    • Distribution makes logical sense
  3. Every phase has validation gate with >=3 criteria

    • Clear success metrics
    • Measurable outcomes
    • Verification method defined
  4. Wave plan is correct for complexity >=0.5 AND multiple domains >=30%

    • Parallel waves only when justified
    • Sequential integration phase included
    • Domain-specific agent assignments
  5. Plan is stored in Serena memory

    • Memory key: phase_plan_{project_name}
    • Retrievable via read_memory()
    • Contains complete phase structure

Validation:

def validate_phase_plan(plan):
    # Verify phase count algorithm
    if plan.complexity_score < 0.30:
        assert plan.phase_count == 3
    elif plan.complexity_score < 0.50:
        assert plan.phase_count in [3, 4]
    elif plan.complexity_score < 0.70:
        assert plan.phase_count == 5
    elif plan.complexity_score < 0.85:
        assert plan.phase_count == 5
    else:
        assert plan.phase_count in [5, 6]

    # Verify timeline percentages
    total_percentage = sum(phase.percentage for phase in plan.phases)
    assert abs(total_percentage - 100.0) < 0.01, "Timeline must sum to 100%"

    # Verify validation gates
    for phase in plan.phases:
        assert len(phase.validation_criteria) >= 3, "Each phase needs >=3 validation criteria"

    # Verify wave plan logic
    if plan.complexity_score >= 0.5:
        multi_domain = sum(1 for d in plan.domain_percentages.values() if d >= 30) >= 2
        if multi_domain:
            assert plan.wave_plan.enabled, "Wave plan required for complex multi-domain projects"

    # Verify Serena storage
    assert serena.memory_exists(f"phase_plan_{plan.project_name}"), "Plan must be stored in Serena"

Examples

Example 1: Simple Project (Complexity 0.25)

Input:

Complexity: 0.25
Timeline: 8 hours
Domains: Backend 70%, Frontend 30%

Output:

3-Phase Plan:

Phase 1: Setup & Core (30% - 2.4h)
- Project scaffolding
- Backend API implementation
- Basic frontend

Phase 2: Features & Testing (50% - 4h)
- Feature completion
- Integration
- Testing (NO MOCKS)

Phase 3: Deploy (20% - 1.6h)
- Deployment
- Documentation

Example 2: Complex Project (Complexity 0.65)

Input:

Complexity: 0.65
Timeline: 40 hours
Domains: Frontend 45%, Backend 35%, Database 20%

Output:

5-Phase Plan:

Phase 1: Foundation (20% - 8h)
- Environment setup
- Database schema design
- API contract definition

Phase 2: Core Implementation (35% - 14h)
Wave 2a: Frontend (parallel)
Wave 2b: Backend + DB (parallel)
Wave 2c: Integration (sequential)

Phase 3: Integration (25% - 10h)
- Service integration
- Advanced features
- Cross-component flows

Phase 4: Quality (15% - 6h)
- Comprehensive testing
- Performance optimization
- Code refinement

Phase 5: Deployment (5% - 2h)
- Staging deployment
- Documentation
- Handoff

Example 3: Critical Project (Complexity 0.92)

Input:

Complexity: 0.92
Timeline: 80 hours
Domains: Frontend 30%, Backend 40%, Database 20%, Security 10%

Output:

6-Phase Plan (5 + Risk Mitigation):

Phase 1: Foundation (25% - 20h)
- Extensive requirements analysis
- Architecture review
- Security planning
- Environment setup

Phase 2: Core Implementation (25% - 20h)
Wave 2a: Frontend (parallel)
Wave 2b: Backend (parallel)
Wave 2c: Database (parallel)
Wave 2d: Integration (sequential)

Phase 3: Integration (20% - 16h)
- Complex service integration
- Security implementation
- Advanced features

Phase 4: Quality (20% - 16h)
- Extensive testing (NO MOCKS)
- Security audit
- Performance testing
- Load testing

Phase 5: Risk Mitigation (5% - 4h)
- Vulnerability scanning
- Penetration testing
- Disaster recovery testing
- Compliance verification

Phase 6: Deployment (5% - 4h)
- Staged rollout
- Monitoring setup
- Comprehensive documentation
- Knowledge transfer

Validation Checklist

Before finalizing phase plan:

Completeness: ☐ All phases have clear objectives ☐ Timeline distribution sums to 100% ☐ Each phase has validation criteria ☐ Deliverables clearly defined ☐ Wave execution plan (if applicable)

Feasibility: ☐ Timeline matches project constraints ☐ Resource allocation realistic ☐ Dependencies properly sequenced ☐ Parallel work properly identified ☐ Risk mitigations adequate

Integration: ☐ Compatible with spec analysis ☐ Aligns with 8D assessment ☐ Matches complexity score ☐ Wave plan matches domain breakdown ☐ Stored in Serena memory

Integration Points

With Other Skills

spec-analysisphase-planning:

Input: Complexity score, domain breakdown
Usage: Determines phase count and distribution

phase-planningwave-orchestration:

Output: Wave execution plan for Phase 2/3
Usage: Parallel execution coordination

phase-planningcontext-preservation:

Action: Store phase plan in Serena
Usage: Cross-session persistence

With Core Patterns

PHASE_PLANNING.md:

Reference: Detailed 5-phase framework
Usage: Complete methodology and examples

WAVE_ORCHESTRATION.md:

Coordination: Wave execution within phases
Usage: Parallel implementation patterns

TESTING_PHILOSOPHY.md:

Constraint: NO MOCKS in Phase 4
Usage: Test planning requirements

Common Patterns

Pattern 1: Simple Script

Complexity: < 0.3
Phases: 3
Wave: Sequential
Timeline: < 1 day

Focus: Rapid iteration, minimal overhead

Pattern 2: Standard Application

Complexity: 0.3-0.7
Phases: 4-5
Wave: Parallel (Frontend/Backend)
Timeline: 1-5 days

Focus: Structured progression, quality gates

Pattern 3: Critical System

Complexity: > 0.85
Phases: 5-6
Wave: Parallel + Sequential integration
Timeline: > 5 days

Focus: Rigorous validation, risk mitigation

Anti-Patterns to Avoid

Phase Skipping: Never skip validation gates ❌ Premature Optimization: Don't over-engineer simple projects ❌ Under-Planning: Don't under-estimate critical systems ❌ Ignoring Complexity: Always use complexity score ❌ Fixed Templates: Always adapt to project needs

References

  • PHASE_PLANNING.md: Complete 5-phase methodology (1562 lines)
  • 5-phase-examples.md: Detailed examples (3 scenarios)
  • phase-template.md: Reusable phase structure
  • validation-gate.md: Gate criteria templates

Version: 1.0.0 Last Updated: 2025-11-03 Shannon Version: 4.0.0+