Phase Planning Skill
Overview
The phase-planning skill generates structured, complexity-adaptive implementation plans using a 5-phase framework with validation gates. It adapts phase count and timeline distribution based on project complexity, ensuring appropriate rigor for simple scripts through critical systems.
When to Use
Use this skill when:
- Planning implementation after spec analysis complete
- Need structured timeline with validation checkpoints
- Want systematic progression with quality gates
- Require resource allocation and effort distribution
- Have complexity score from spec-analysis (0.0-1.0)
DO NOT use when:
- No spec analysis available (run @spec-analysis first)
- Ad-hoc tasks without formal planning needs
- Quick experiments or prototypes
Core Competencies
- Complexity-Adaptive Planning: Automatically adjusts phase count (3-6 phases) based on complexity score, ensuring appropriate rigor without over-engineering
- Timeline Distribution: Calculates optimal time allocation per phase using algorithmic formula with complexity and domain-based adjustments
- Validation Gates: Defines explicit success criteria between phases to prevent downstream failures and ensure quality progression
- Wave Coordination: Maps parallel execution patterns to phases for multi-agent coordination when complexity >=0.5
- Serena Integration: Persists phase plans to memory for cross-session retrieval and wave agent coordination
Inputs
Required:
complexity_score(float 0.0-1.0): Complexity score from spec-analysisspec_analysis_result(object): Complete spec analysis including domain breakdown, features, timeline constraintsproject_name(string): Name of project for phase plan identification
Optional:
timeline_constraint(string): Total available timeline (e.g., "40 hours", "2 weeks")domain_preferences(object): Override domain-based timeline adjustmentscustom_phases(array): Custom phase definitions for non-standard workflows
Anti-Rationalization (From Baseline Testing)
CRITICAL: Agents systematically rationalize skipping or adjusting phase planning patterns. Below are the 4 most common rationalizations detected in baseline testing, with mandatory counters.
Rationalization 1: "Let's skip to waves, phases are redundant"
Example: User says "Let's create the wave execution plan" → Agent responds "That wave structure looks reasonable..." and skips phase planning entirely
COUNTER:
- ❌ NEVER skip phase planning when user jumps to waves
- ✅ Phases structure work; waves coordinate agents
- ✅ Phases MUST come before waves (phases define WHAT, waves define WHO)
- ✅ If user suggests waves first, respond: "First we need phase planning to structure the work, THEN we can create waves"
Rule: Phases always precede waves. No exceptions.
Rationalization 2: "3 phases work for everything, keep it simple"
Example: User says "Let's use Setup-Build-Deploy for this 0.72 complexity project" → Agent responds "That simplified structure makes sense..."
COUNTER:
- ❌ NEVER accept 3-phase template for complex projects
- ✅ Complexity score determines phase count (algorithm, not preference)
- ✅ 0.70-0.85 complexity REQUIRES 5 phases + extended gates
- ✅ Simplification bias under-estimates effort by 40-60%
- ✅ "Keep it simple" means follow the algorithm, not skip rigor
Rule: Apply complexity-based adaptation. Simple ≠ fewer phases for complex work.
Rationalization 3: "Validation gates are overhead, team will coordinate naturally"
Example: User says "We don't need formal gates" → Agent creates phases without validation criteria
COUNTER:
- ❌ NEVER omit validation gates to reduce "overhead"
- ✅ Gates prevent downstream failures (catch issues early)
- ✅ "Natural coordination" = unvalidated assumptions = technical debt
- ✅ Gates take 5-10 minutes to define, prevent hours of rework
- ✅ Every phase transition MUST have explicit success criteria
Rule: Every phase MUST have validation gate. Not optional.
Rationalization 4: "Timeline percentages feel wrong, adjust them"
Example: User says "20% for setup feels too long" → Agent adjusts to 5% based on intuition
COUNTER:
- ❌ NEVER adjust timeline distribution based on "feeling"
- ✅ Percentages are algorithmic (complexity + domain adjustments)
- ✅ If percentages feel wrong, the algorithm is right
- ✅ "Feels too long" often means under-estimating hidden complexity
- ✅ Only recalculate if you find FORMULA ERROR (wrong calculation, wrong weights)
Rule: Follow timeline distribution formula. Intuition doesn't override math.
Detection Signal
If you're tempted to:
- Skip phases and go to waves
- Use 3 phases regardless of complexity
- Omit validation gates
- Adjust timeline percentages subjectively
Then you are rationalizing. Stop. Follow the protocol. Apply the algorithm.
Core Algorithm
5-Phase Framework
Phase 1: Foundation & Setup (10-20% timeline)
├─ Infrastructure, tooling, environment
├─ Project scaffolding, dependencies
└─ Initial configuration
Phase 2: Core Implementation (30-40% timeline)
├─ Primary functionality
├─ Core algorithms and logic
└─ Essential features
Phase 3: Integration & Enhancement (20-30% timeline)
├─ Service integration
├─ Advanced features
└─ Cross-component functionality
Phase 4: Quality & Polish (15-25% timeline)
├─ Testing (NO MOCKS)
├─ Performance optimization
└─ Code refinement
Phase 5: Deployment & Handoff (10-15% timeline)
├─ Production deployment
├─ Documentation
└─ Knowledge transfer
Complexity-Based Adaptation
Simple (0.00-0.30): 3 phases
Phase 1: Setup & Core (30%)
Phase 2: Features & Testing (50%)
Phase 3: Deploy (20%)
Moderate (0.30-0.50): 3-4 phases
Phase 1: Setup (20%)
Phase 2: Implementation (45%)
Phase 3: Testing (25%)
Phase 4: Deploy (10%)
Complex (0.50-0.70): 5 phases (standard)
All 5 phases with standard distribution
High (0.70-0.85): 5 phases + extended
All 5 phases + extended validation gates
+ Risk mitigation checkpoints
+ Progress review gates
Critical (0.85-1.00): 5 phases + risk mitigation
All 5 phases + risk mitigation phases
+ Extensive validation gates
+ Architecture review gates
+ Security review gates
+ Performance validation gates
Workflow
Phase 1: Context Loading
Retrieve Spec Analysis
- Action: Read from Serena memory or specification document
- Tool:
read_memory("spec_analysis")or Read - Output: Complexity score, domain breakdown, total timeline
Extract Key Parameters
- Action: Parse complexity score, domain percentages, timeline constraints
- Validation: Verify complexity score is 0.0-1.0, domains sum to 100%
- Output: Validated input parameters
Phase 2: Phase Structure Determination
Calculate Phase Count
- Action: Apply complexity-based algorithm to determine 3-6 phases
- Tool: Python calculation or algorithmic decision tree
- Output: Integer phase count (3-6)
Select Phase Pattern
- Action: Choose phase template based on complexity band
- Validation: Verify pattern matches complexity requirements
- Output: Phase structure (Simple/Moderate/Complex/High/Critical)
Phase 3: Timeline Distribution
Calculate Base Percentages
- Action: Apply standard 5-phase distribution (15%, 35%, 25%, 20%, 5%)
- Tool: Mathematical calculation
- Output: Base timeline percentages
Apply Complexity Adjustments
- Action: Adjust percentages based on complexity score
- Formula: Simple (+5% setup), Complex (+5% planning, -5% impl), High (+10% planning), Critical (+15% planning)
- Output: Complexity-adjusted percentages
Apply Domain Adjustments
- Action: Adjust based on dominant domains (Frontend-heavy, Backend-heavy, Database-heavy)
- Formula: Frontend >50% (+5% Phase 2, +5% Phase 4, -10% Phase 5)
- Output: Final timeline distribution summing to 100%
Phase 4: Validation Gate Definition
Define Per-Phase Criteria
- Action: Specify success criteria for each phase transition
- Tool: Template-based generation with domain customization
- Output: Validation checklist per phase
Verification Method
- Action: Define how to verify each criterion
- Output: Verification procedures (tests, reviews, checks)
Phase 5: Wave Mapping (if complexity >=0.5)
Determine Parallelization Pattern
- Action: Identify which phases can use parallel wave execution
- Trigger: Multiple domains >=30%, complexity >=0.5
- Output: Wave pattern (Two Parallel + Integration or Three Parallel + Integration)
Map Waves to Phases
- Action: Assign domain-specific agents to parallel waves
- Output: Wave execution plan for Phase 2/3
Phase 6: Document Generation & Storage
Generate Phase Plan Document
- Action: Populate template with calculated values
- Tool: Write Markdown structure
- Output: Complete phase plan in Markdown format
Store in Serena Memory
- Action: Persist to Serena for cross-session retrieval
- Tool:
write_memory("phase_plan", plan_object) - Output: Memory storage confirmation
Implementation Protocol
Step 1: Load Context
REQUIRED INPUTS:
1. read_memory("spec_analysis") - Get complexity score
2. read_memory("8d_assessment") - Get domain breakdown
3. Current specification document
4. Project timeline constraints
EXTRACT:
- Complexity score: [0.0-1.0]
- Total timeline: [hours/days]
- Domain percentages: {frontend, backend, database, ...}
- Critical requirements: [list]
Step 2: Determine Phase Structure
def determine_phase_count(complexity: float) -> int:
if complexity < 0.30:
return 3 # Simple
elif complexity < 0.50:
return 4 # Moderate (3-4 flexible)
elif complexity < 0.70:
return 5 # Complex
elif complexity < 0.85:
return 5 # High (+ extended gates)
else:
return 6 # Critical (+ risk mitigation)
Step 3: Calculate Timeline Distribution
Standard 5-Phase Distribution:
Phase 1: 15% (10-20% range)
Phase 2: 35% (30-40% range)
Phase 3: 25% (20-30% range)
Phase 4: 20% (15-25% range)
Phase 5: 5% (10-15% range)
Complexity Adjustments:
Simple (0.00-0.30):
Phase 1: +5% (more setup proportionally)
Phase 2: +10% (straightforward implementation)
Phase 3: -15% (less integration complexity)
Complex (0.50-0.70):
Phase 1: +5% (more planning needed)
Phase 2: -5% (parallel execution helps)
Phase 3: +5% (more integration work)
Phase 4: -5% (offset)
High (0.70-0.85):
Phase 1: +10% (extensive planning)
Phase 2: -10% (higher coordination overhead)
Phase 3: +5% (complex integration)
Phase 4: +5% (rigorous testing)
Critical (0.85-1.00):
Phase 1: +15% (exhaustive planning)
Phase 2: -15% (very high coordination)
Phase 3: +5% (critical integration)
Phase 4: +10% (extensive testing)
Phase 5: +5% (careful deployment)
Domain-Based Adjustments:
If Frontend-Heavy (>50%):
Phase 2: +5% (UI work time-consuming)
Phase 4: +5% (E2E testing)
Phase 5: -10% (static hosting simpler)
If Backend-Heavy (>50%):
Phase 1: +5% (API design critical)
Phase 4: +5% (integration testing complex)
Phase 2: -10% (offset)
If Database-Heavy (>30%):
Phase 1: +5% (schema design critical)
Phase 2: -5% (offset from Phase 1)
Step 4: Define Validation Gates
Phase 1 → Phase 2 Gate:
Criteria:
☐ Requirements fully documented
☐ Technical approach confirmed
☐ All dependencies identified
☐ Environment setup complete
☐ No blocking unknowns
Verification:
- Review requirements.md completeness
- Verify all MCPs installed
- Confirm technical stack validated
- Check for unresolved questions
Phase 2 → Phase 3 Gate:
Criteria:
☐ Core functionality complete
☐ Unit tests passing
☐ Code review completed
☐ Performance acceptable
☐ No critical bugs
Verification:
- Run test suite (100% pass required)
- Execute code quality checks
- Measure performance benchmarks
- Review bug tracker
Phase 3 → Phase 4 Gate:
Criteria:
☐ All integrations working
☐ Advanced features complete
☐ Integration tests passing
☐ API contracts validated
☐ Cross-component flows verified
Verification:
- Test all service integrations
- Verify API endpoint responses
- Check data flow end-to-end
- Validate authentication/authorization
Phase 4 → Phase 5 Gate:
Criteria:
☐ All tests passing (NO MOCKS)
☐ Code coverage >= 80%
☐ Performance optimized
☐ Documentation complete
☐ Security audit passed
Verification:
- Run full test suite
- Generate coverage report
- Execute performance benchmarks
- Review security checklist
- Verify documentation completeness
Phase 5 → Complete Gate:
Criteria:
☐ Deployed to staging
☐ Smoke tests passing
☐ Deployment docs complete
☐ Handoff checklist complete
☐ Production-ready
Verification:
- Test staging environment
- Run smoke test suite
- Review deployment guide
- Complete knowledge transfer
Step 5: Create Wave Mapping (Phase 3)
Determine Parallelization:
IF complexity >= 0.5 AND multiple domains >= 30% THEN:
Use parallel wave execution
Wave Pattern 1 (Two Parallel + Integration):
Wave 3a: Frontend (parallel)
Wave 3b: Backend + Database (parallel)
Wave 3c: Integration (sequential)
Wave Pattern 2 (Three Parallel + Integration):
Wave 3a: Frontend (parallel)
Wave 3b: Backend (parallel)
Wave 3c: Database (parallel)
Wave 3d: Integration (sequential)
Wave Pattern 3 (Sequential):
Wave 3a: All implementation (sequential)
Step 6: Generate Phase Plan Document
Output Structure:
# Implementation Plan: [Project Name]
## Executive Summary
- Complexity Score: [0.0-1.0]
- Phase Count: [3-6]
- Total Timeline: [X hours/days]
- Parallelization: [Yes/No]
## Phase Breakdown
### Phase 1: Foundation & Setup ([X%] - [Y hours])
**Objectives**:
- [Objective 1]
- [Objective 2]
**Key Activities**:
1. [Activity 1] (Z% of phase)
2. [Activity 2] (W% of phase)
**Deliverables**:
- [Deliverable 1]
- [Deliverable 2]
**Validation Gate**:
☐ Criteria 1
☐ Criteria 2
**Estimated Duration**: [X hours]
[Repeat for all phases...]
## Risk Mitigation (Critical/High only)
[Risk mitigation phases/checkpoints]
## Success Metrics
- Timeline adherence: ±[X]%
- Quality gates: 100% pass rate
- Test coverage: >= 80%
Step 7: Store in Serena Memory
write_memory("phase_plan", {
project_name: string,
complexity_score: float,
phase_count: int,
total_timeline: string,
phases: [
{
number: int,
name: string,
percentage: float,
duration: string,
objectives: string[],
activities: string[],
deliverables: string[],
validation_criteria: string[]
}
],
wave_plan: {
enabled: boolean,
pattern: string,
waves: Wave[]
},
risk_mitigations: RiskMitigation[],
created_at: timestamp
})
Outputs
Structured output object:
{
"project_name": "string",
"complexity_score": "float (0.0-1.0)",
"phase_count": "int (3-6)",
"total_timeline": "string (e.g., '40 hours', '2 weeks')",
"interpretation_band": "Simple | Moderate | Complex | High | Critical",
"phases": [
{
"number": "int",
"name": "string",
"percentage": "float (sums to 100%)",
"duration": "string",
"objectives": ["objective1", "objective2"],
"activities": ["activity1", "activity2"],
"deliverables": ["deliverable1", "deliverable2"],
"validation_criteria": ["criterion1", "criterion2"]
}
],
"wave_plan": {
"enabled": "boolean",
"pattern": "Sequential | TwoParallel | ThreeParallel",
"waves": [
{
"wave_id": "string",
"phase": "int",
"agents": ["agent1", "agent2"],
"execution": "parallel | sequential"
}
]
},
"domain_adjustments": {
"frontend_adjustment": "string",
"backend_adjustment": "string",
"database_adjustment": "string"
},
"created_at": "ISO timestamp"
}
Markdown Document: Complete phase plan document saved to:
- Serena memory:
phase_plan_{project_name} - Local file:
PHASE_PLAN.md(optional)
Success Criteria
This skill succeeds if:
✅ Phase count is algorithmically correct
- Complexity 0.00-0.30 → 3 phases
- Complexity 0.30-0.50 → 3-4 phases
- Complexity 0.50-0.70 → 5 phases
- Complexity 0.70-0.85 → 5 phases + extended gates
- Complexity 0.85-1.00 → 5-6 phases + risk mitigation
✅ Timeline percentages sum to exactly 100%
- No rounding errors
- All adjustments accounted for
- Distribution makes logical sense
✅ Every phase has validation gate with >=3 criteria
- Clear success metrics
- Measurable outcomes
- Verification method defined
✅ Wave plan is correct for complexity >=0.5 AND multiple domains >=30%
- Parallel waves only when justified
- Sequential integration phase included
- Domain-specific agent assignments
✅ Plan is stored in Serena memory
- Memory key:
phase_plan_{project_name} - Retrievable via
read_memory() - Contains complete phase structure
- Memory key:
Validation:
def validate_phase_plan(plan):
# Verify phase count algorithm
if plan.complexity_score < 0.30:
assert plan.phase_count == 3
elif plan.complexity_score < 0.50:
assert plan.phase_count in [3, 4]
elif plan.complexity_score < 0.70:
assert plan.phase_count == 5
elif plan.complexity_score < 0.85:
assert plan.phase_count == 5
else:
assert plan.phase_count in [5, 6]
# Verify timeline percentages
total_percentage = sum(phase.percentage for phase in plan.phases)
assert abs(total_percentage - 100.0) < 0.01, "Timeline must sum to 100%"
# Verify validation gates
for phase in plan.phases:
assert len(phase.validation_criteria) >= 3, "Each phase needs >=3 validation criteria"
# Verify wave plan logic
if plan.complexity_score >= 0.5:
multi_domain = sum(1 for d in plan.domain_percentages.values() if d >= 30) >= 2
if multi_domain:
assert plan.wave_plan.enabled, "Wave plan required for complex multi-domain projects"
# Verify Serena storage
assert serena.memory_exists(f"phase_plan_{plan.project_name}"), "Plan must be stored in Serena"
Examples
Example 1: Simple Project (Complexity 0.25)
Input:
Complexity: 0.25
Timeline: 8 hours
Domains: Backend 70%, Frontend 30%
Output:
3-Phase Plan:
Phase 1: Setup & Core (30% - 2.4h)
- Project scaffolding
- Backend API implementation
- Basic frontend
Phase 2: Features & Testing (50% - 4h)
- Feature completion
- Integration
- Testing (NO MOCKS)
Phase 3: Deploy (20% - 1.6h)
- Deployment
- Documentation
Example 2: Complex Project (Complexity 0.65)
Input:
Complexity: 0.65
Timeline: 40 hours
Domains: Frontend 45%, Backend 35%, Database 20%
Output:
5-Phase Plan:
Phase 1: Foundation (20% - 8h)
- Environment setup
- Database schema design
- API contract definition
Phase 2: Core Implementation (35% - 14h)
Wave 2a: Frontend (parallel)
Wave 2b: Backend + DB (parallel)
Wave 2c: Integration (sequential)
Phase 3: Integration (25% - 10h)
- Service integration
- Advanced features
- Cross-component flows
Phase 4: Quality (15% - 6h)
- Comprehensive testing
- Performance optimization
- Code refinement
Phase 5: Deployment (5% - 2h)
- Staging deployment
- Documentation
- Handoff
Example 3: Critical Project (Complexity 0.92)
Input:
Complexity: 0.92
Timeline: 80 hours
Domains: Frontend 30%, Backend 40%, Database 20%, Security 10%
Output:
6-Phase Plan (5 + Risk Mitigation):
Phase 1: Foundation (25% - 20h)
- Extensive requirements analysis
- Architecture review
- Security planning
- Environment setup
Phase 2: Core Implementation (25% - 20h)
Wave 2a: Frontend (parallel)
Wave 2b: Backend (parallel)
Wave 2c: Database (parallel)
Wave 2d: Integration (sequential)
Phase 3: Integration (20% - 16h)
- Complex service integration
- Security implementation
- Advanced features
Phase 4: Quality (20% - 16h)
- Extensive testing (NO MOCKS)
- Security audit
- Performance testing
- Load testing
Phase 5: Risk Mitigation (5% - 4h)
- Vulnerability scanning
- Penetration testing
- Disaster recovery testing
- Compliance verification
Phase 6: Deployment (5% - 4h)
- Staged rollout
- Monitoring setup
- Comprehensive documentation
- Knowledge transfer
Validation Checklist
Before finalizing phase plan:
Completeness: ☐ All phases have clear objectives ☐ Timeline distribution sums to 100% ☐ Each phase has validation criteria ☐ Deliverables clearly defined ☐ Wave execution plan (if applicable)
Feasibility: ☐ Timeline matches project constraints ☐ Resource allocation realistic ☐ Dependencies properly sequenced ☐ Parallel work properly identified ☐ Risk mitigations adequate
Integration: ☐ Compatible with spec analysis ☐ Aligns with 8D assessment ☐ Matches complexity score ☐ Wave plan matches domain breakdown ☐ Stored in Serena memory
Integration Points
With Other Skills
spec-analysis → phase-planning:
Input: Complexity score, domain breakdown
Usage: Determines phase count and distribution
phase-planning → wave-orchestration:
Output: Wave execution plan for Phase 2/3
Usage: Parallel execution coordination
phase-planning → context-preservation:
Action: Store phase plan in Serena
Usage: Cross-session persistence
With Core Patterns
PHASE_PLANNING.md:
Reference: Detailed 5-phase framework
Usage: Complete methodology and examples
WAVE_ORCHESTRATION.md:
Coordination: Wave execution within phases
Usage: Parallel implementation patterns
TESTING_PHILOSOPHY.md:
Constraint: NO MOCKS in Phase 4
Usage: Test planning requirements
Common Patterns
Pattern 1: Simple Script
Complexity: < 0.3
Phases: 3
Wave: Sequential
Timeline: < 1 day
Focus: Rapid iteration, minimal overhead
Pattern 2: Standard Application
Complexity: 0.3-0.7
Phases: 4-5
Wave: Parallel (Frontend/Backend)
Timeline: 1-5 days
Focus: Structured progression, quality gates
Pattern 3: Critical System
Complexity: > 0.85
Phases: 5-6
Wave: Parallel + Sequential integration
Timeline: > 5 days
Focus: Rigorous validation, risk mitigation
Anti-Patterns to Avoid
❌ Phase Skipping: Never skip validation gates ❌ Premature Optimization: Don't over-engineer simple projects ❌ Under-Planning: Don't under-estimate critical systems ❌ Ignoring Complexity: Always use complexity score ❌ Fixed Templates: Always adapt to project needs
References
- PHASE_PLANNING.md: Complete 5-phase methodology (1562 lines)
- 5-phase-examples.md: Detailed examples (3 scenarios)
- phase-template.md: Reusable phase structure
- validation-gate.md: Gate criteria templates
Version: 1.0.0 Last Updated: 2025-11-03 Shannon Version: 4.0.0+