Claude Code Plugins

Community-maintained marketplace

Feedback
2
0

Building commissioning workflows including MBCx procedures, testing protocols, report generation, and energy conservation measure verification following ASHRAE Guideline 0 and NEBB standards

Install Skill

1Download skill
2Enable skills in Claude

Open claude.ai/settings/capabilities and find the "Skills" section

3Upload to Claude

Click "Upload skill" and select the downloaded ZIP file

Note: Please verify skill by going through its instructions before using it.

SKILL.md

name commissioning-reports
description Building commissioning workflows including MBCx procedures, testing protocols, report generation, and energy conservation measure verification following ASHRAE Guideline 0 and NEBB standards

Commissioning Reports Skill

This skill provides comprehensive guidance for building commissioning and retro-commissioning projects.

Core Capabilities

Commissioning Process

  • MBCx planning and scoping
  • Systems investigation procedures
  • Testing and verification protocols
  • Implementation tracking and verification

Documentation and Reporting

  • Commissioning plan development
  • Test procedure creation
  • Issues list management
  • Final report generation

Standards Compliance

  • ASHRAE Guideline 0 procedures
  • NEBB testing standards
  • Local utility program requirements
  • Energy savings verification

Available Scripts

  • scripts/test_scheduler.py: Generate testing schedules
  • scripts/issues_tracker.py: Manage commissioning issues
  • scripts/savings_calculator.py: Calculate energy savings

Reference Materials

-

eferences/ashrae_guideline0.md: ASHRAE Guideline 0 requirements

eferences/test_procedures.md: Standard test procedures

eferences/nebb_standards.md: NEBB testing standards

Asset Templates

  • ssets/commissioning_plan_template.docx: Standard Cx plan format
  • ssets/test_forms/: Equipment testing forms
  • ssets/report_template.docx: Final commissioning report template

Usage Examples

  • "Create a commissioning plan for this office building"
  • "Generate test procedures for VAV box verification"
  • "Calculate energy savings from this ECM implementation"
  • "Track and manage commissioning issues list"