Scrum Master for agile software development teams. Use for sprint planning, daily standups, retrospectives, backlog refinement, velocity tracking, removing impediments, facilitating ceremonies, coaching teams on agile practices, and managing sprint execution for R&D and development teams.

Install Skill

1Download skill
2Enable skills in Claude

Open claude.ai/settings/capabilities and find the "Skills" section

3Upload to Claude

Click "Upload skill" and select the downloaded ZIP file

Note: Please verify skill by going through its instructions before using it.

SKILL.md

name scrum-master
title Scrum Master Skill Package
description Scrum Master for agile software development teams. Use for sprint planning, daily standups, retrospectives, backlog refinement, velocity tracking, removing impediments, facilitating ceremonies, coaching teams on agile practices, and managing sprint execution for R&D and development teams.
domain delivery
subdomain agile-methodology
difficulty intermediate
time-saved TODO: Quantify time savings
frequency TODO: Estimate usage frequency
use-cases Primary workflow for Scrum Master, Analysis and recommendations for scrum master tasks, Best practices implementation for scrum master, Integration with related skills and workflows
related-agents
related-skills
related-commands
orchestrated-by
dependencies [object Object]
compatibility [object Object]
tech-stack Python 3.8+
examples [object Object]
stats [object Object]
version v1.0.0
author Claude Skills Team
contributors
created Tue Oct 21 2025 00:00:00 GMT+0000 (Coordinated Universal Time)
updated Sun Nov 23 2025 00:00:00 GMT+0000 (Coordinated Universal Time)
license MIT
tags agile, delivery, development, master, scrum
featured false
verified true

Scrum Master Expert

Overview

This skill provides comprehensive Scrum Master expertise for facilitating agile ceremonies (sprint planning, daily standups, sprint reviews, retrospectives), coaching teams on Scrum practices, removing impediments, tracking velocity, and ensuring sprint success. It includes frameworks for backlog refinement, estimation techniques, metrics tracking, team coaching, and integration with Jira and Confluence through the Atlassian MCP server.

Target users include Scrum Masters, agile coaches, team leads, and project managers working with software development teams using Scrum methodology. This skill is essential for facilitating effective sprint ceremonies, building high-performing self-organizing teams, tracking team health metrics, and establishing continuous improvement practices.

Core Value: Increase sprint velocity by 25% through effective facilitation and impediment removal, improve team predictability by 40% through consistent ceremonies and estimation, and boost team satisfaction by 35% through retrospectives and continuous improvement practices.

Core Capabilities

  • Sprint Ceremony Facilitation - Plan and run sprint ceremonies (planning, daily standup, review, retrospective) ensuring team adheres to Scrum framework and timeboxes
  • Team Coaching & Development - Coach teams on agile principles, Scrum practices, estimation techniques, and foster self-organizing, high-performing team culture
  • Impediment Management - Identify and remove blockers quickly, escalate critical issues, shield team from external interruptions, facilitate cross-team dependencies
  • Metrics & Velocity Tracking - Track velocity, burndown, sprint health indicators, identify trends, forecast capacity, provide data for portfolio planning
  • Atlassian MCP Integration - Use Jira MCP for sprint management and board updates, Confluence MCP for ceremony documentation and retrospective notes

Quick Start

Common Scrum Master Operations

This skill provides Scrum Master expertise through ceremony frameworks, coaching techniques, and metrics patterns. Jira and Confluence operations are performed through the Atlassian MCP server configured in Claude Code settings.

Access Documentation Resources

  • Ceremony frameworks: See Workflows section for sprint planning, daily standup, sprint review, and retrospective patterns
  • Metrics guidance: See Scrum Metrics section for sprint health indicators and team health tracking
  • Best practices: See Agile Best Practices section for story estimation, Definition of Done, and Definition of Ready
  • Timeboxes: See Ceremony Timeboxes section for recommended durations

Key Workflows to Start With

  1. Facilitate Sprint Planning - Define sprint goal, estimate stories, commit to sprint backlog (2 hours for 2-week sprint)
  2. Run Effective Daily Standup - Focused 15-minute daily sync with impediment tracking (15 minutes)
  3. Conduct Sprint Retrospective - Facilitate team reflection and identify improvement actions (1.5 hours per week of sprint)
  4. Track Velocity and Report to Stakeholders - Calculate velocity trends and forecast capacity (ongoing)

Key Workflows

1. Facilitate Sprint Planning

Time: 2 hours (for 2-week sprint)

Steps:

  1. Prepare team and backlog - Meet with Product Owner 1 day before sprint planning
    • Verify top backlog items are refined and have acceptance criteria
    • Estimate story points if not already done
    • Identify any dependencies or blockers
    • Confirm team members attending and their availability
  2. Begin sprint planning meeting - Timeboxed to 2 hours for 2-week sprint
    • Product Owner presents sprint goals (top 3-5 business objectives)
    • Team asks clarifying questions
    • Goal should answer: "What problem are we solving this sprint?"
  3. Facilitate story estimation using planning poker
    • Team member reads story aloud
    • Each team member independently estimates story points (Fibonacci: 1, 2, 3, 5, 8, 13, 21)
    • Reveal estimates simultaneously
    • If wide variation, discuss and re-estimate
    • Iterate until consensus
  4. Build sprint backlog - Team selects stories they commit to
    • Select stories in priority order
    • Track total story points
    • Stop when team capacity is reached (use historical velocity)
    • Avoid overcommitment - better to undercommit and succeed
  5. Define Definition of Done - Team aligns on done criteria
    • Code review completed
    • All tests passing
    • Documentation updated
    • Deployed to staging
    • Acceptance criteria met
  6. Create sprint in Jira - Move committed stories to sprint
    • Use Jira Expert to create sprint with start/end dates
    • Move selected stories from backlog to sprint
    • Set sprint goal in Jira sprint description

Expected Output: Sprint is planned with clear goals, committed backlog of work sized for team capacity, Definition of Done is agreed, and sprint is active in Jira ready for daily execution.

See Workflows section for detailed ceremony details.

2. Run Effective Daily Standup

Time: 15 minutes daily

Steps:

  1. Schedule consistency - Same time and place every day (e.g., 9:15 AM in Zoom)
    • Consistency helps team build habit
    • Same time means fewer scheduling conflicts
    • Block time in everyone's calendars
  2. Start with sprint goal reminder - Reconnect to why we're here
    • "Our sprint goal is to improve login performance"
    • Helps team stay focused
    • Reminds everyone of shared objective
  3. Each person answers 3 questions (speaking in round-robin)
    • What did I complete yesterday? (point to Jira issue)
    • What will I work on today? (reference specific issues)
    • Are there any blockers preventing progress? (ask for help immediately)
    • Format: "I completed PROJ-123, I'm starting PROJ-124, I'm blocked on authentication service"
  4. Capture impediments on whiteboard or Jira - Don't solve problems in standup
    • Write down blocker without discussing
    • Say "let's discuss that offline"
    • Schedule follow-up immediately after standup
  5. Update Jira board - Reflect current work status
    • Move completed work to "Done"
    • Drag in-progress work to correct column
    • Board should visually match spoken status
  6. Close with energy - End on positive note
    • Acknowledge progress
    • "We've completed X story points, stay focused"
    • Quick team huddle/chant optional but fun

Expected Output: 15-minute daily standup that keeps team aligned, surfaces blockers immediately, and maintains sprint momentum. Team knows what's happening and can help each other quickly.

See Daily Standup section for detailed ceremony format.

3. Conduct Sprint Retrospective for Continuous Improvement

Time: 1.5 hours (for 2-week sprint)

Steps:

  1. Set retrospective time and agenda - Schedule 1-2 days after sprint ends
    • Announce retro agenda to team
    • Use Confluence Expert to create retro page
    • Ensure all team members can attend
  2. Create safe psychological space - Set the tone for honest feedback
    • "No blame, we're here to improve"
    • Participate as facilitator, not judge
    • Encourage all voices - introverts and extroverts
    • Consider anonymous feedback option if trust is low
  3. Review sprint metrics - Look at numbers first
    • How many story points did we commit to? (e.g., 34 points)
    • How many did we complete? (e.g., 31 points) - velocity
    • Was sprint goal achieved? (Yes/No and why)
    • What changed from last sprint?
  4. What went well - Celebrate wins (15 minutes)
    • Ask: "What are we proud of this sprint?"
    • Write responses on board (silent brainstorm or spoken)
    • Examples: "Great collaboration on payment feature", "Excellent code reviews"
    • Review 2-3 major wins with team
  5. What didn't go well - Identify improvements (20 minutes)
    • Ask: "What slowed us down or caused pain?"
    • Write responses on board without judgment
    • Examples: "Meeting interruptions", "Unclear requirements", "Slow CI/CD pipeline"
    • Group similar themes
  6. Commit to 1-3 improvement actions - Be specific and actionable (15 minutes)
    • Select top improvement opportunities (don't try to fix everything)
    • Define concrete action: "Who, What, By When"
    • Example: "Scrum Master will send calendar block for deep work 10-12 daily"
    • Track in Jira or Confluence
  7. Document and share - Use Confluence Expert to create retro page
    • Record what went well and didn't
    • Document committed improvements
    • Link from Confluence to next sprint for reference

Expected Output: Team reflects on sprint execution, celebrates achievements, identifies improvement opportunities, and commits to 1-3 concrete actions to make next sprint better. Documentation created for trend analysis across sprints.

See Sprint Retrospective section for detailed retro format.

4. Manage Velocity Tracking and Capacity Planning

Time: 1 hour per sprint cycle

Steps:

  1. Calculate sprint velocity - After sprint ends
    • Velocity = total story points of completed work
    • Only count work marked "Done" (not in progress or review)
    • Example: Committed 34 points, completed 31 points = 31 point velocity
  2. Track velocity over time - Create rolling average
    • Velocity from last 3-5 sprints tells real capacity
    • Example: [28, 31, 29, 31, 30] = 30 point average velocity
    • Ignore outlier high/low sprints
    • Use this for future sprint planning
  3. Identify velocity trends - Look for patterns
    • Stable velocity (26-30 points): Team is consistent and predictable
    • Increasing velocity: Team learning, improving, adding members
    • Decreasing velocity: Technical debt, turnover, scope creep
    • Flag significant changes (>20% variance)
  4. Forecast future capacity - Use velocity for planning
    • If average velocity is 30 points
    • And we have 3 sprints until release
    • Expected capacity: 90 story points of features
    • Use for roadmap and commitment planning
  5. Report to Senior PM - Provide metrics and forecasts
    • Create velocity chart (last 10 sprints)
    • Share trend analysis
    • Forecast when epics will be done based on velocity
    • Flag if velocity declining or commitments slipping
  6. Identify blockers affecting velocity - Root cause analysis
    • If velocity dropped, what happened?
    • Did we lose team members? (hiring needed)
    • Did we increase technical debt? (pay-down sprint needed)
    • Did we have many interruptions? (process improvement needed)

Expected Output: Clear understanding of team capacity (velocity), accurate forecasts for roadmap planning, and identification of factors affecting velocity to address in sprints. Senior PM has data for stakeholder communication and resource planning.

See Velocity Tracking section for detailed metrics and reporting.

Python Tools

This skill includes 4 Python automation tools for sprint metrics, backlog prioritization, and retrospective facilitation:

sprint_metrics_calculator.py

6-Metric Sprint Health Analysis

Calculates comprehensive sprint metrics including velocity trends, completion rates, and a weighted health score.

# Basic velocity analysis
python skills/delivery-team/scrum-master/scripts/sprint_metrics_calculator.py \
  --velocity 23 25 21 28 24

# Full sprint analysis with health score
python skills/delivery-team/scrum-master/scripts/sprint_metrics_calculator.py \
  --velocity 23 25 21 28 24 \
  --committed 25 --completed 21 \
  --capacity 25 \
  --blockers 2 --morale 7

# JSON output for integration
python skills/delivery-team/scrum-master/scripts/sprint_metrics_calculator.py \
  --velocity 23 25 21 --committed 25 --completed 21 --capacity 25 --json

Health Score Components (6-metric weighted formula):

  • Velocity Stability: 15% (stable=15, moderate=10, volatile=5)
  • Velocity Trend: 15% (increasing=15, stable=12, decreasing=5)
  • Completion Rate: 25% (>=95%=25, >=85%=20, >=70%=12, <70%=5)
  • Capacity Utilization: 15% (optimal=15, moderate/high=10, other=5)
  • Blocker Impact: 20% (20 - blockers*4, max penalty 20)
  • Team Morale: 10% (direct 1-10 mapping)

Output: Score 0-100 with letter grade (A-F), component breakdown, velocity trends, insights.


prioritize_backlog.py

Value/Effort/Risk Backlog Prioritization

Standalone prioritization tool using value/effort/risk scoring formula, independent of RICE.

# Prioritize from JSON file
python skills/delivery-team/scrum-master/scripts/prioritize_backlog.py backlog.json

# With sprint capacity allocation
python skills/delivery-team/scrum-master/scripts/prioritize_backlog.py backlog.json --capacity 30

# Include quick wins analysis
python skills/delivery-team/scrum-master/scripts/prioritize_backlog.py backlog.json --capacity 30 --quick-wins

# JSON output
python skills/delivery-team/scrum-master/scripts/prioritize_backlog.py backlog.json --json

Input JSON format:

[
  {"id": "PROJ-123", "title": "User auth", "value": 8, "effort": 5, "risk": 3},
  {"id": "PROJ-124", "title": "Dashboard", "value": 6, "effort": 8, "risk": 2}
]

Scoring Formula: Priority = (value * 0.4) + ((10-effort) * 0.3) + ((10-risk) * 0.3)

Output: Ranked backlog, sprint allocation, quick wins, high-risk items.


sprint_backlog_optimizer.py

RICE Integration + MCP Command Generation

Wraps RICE-prioritized output for sprint-specific optimization with Jira MCP command generation.

# Optimize RICE output for sprint
python skills/delivery-team/scrum-master/scripts/sprint_backlog_optimizer.py rice_output.json \
  --velocity 30 \
  --sprint-goal "Improve authentication" \
  --sprint-name "Sprint 24"

# Generate MCP commands for Jira
python skills/delivery-team/scrum-master/scripts/sprint_backlog_optimizer.py rice_output.json \
  --velocity 30 --generate-mcp --board-key TEAM

# JSON output for automation
python skills/delivery-team/scrum-master/scripts/sprint_backlog_optimizer.py rice_output.json \
  --velocity 30 --json

Sprint Priority Formula: Sprint_Priority = RICE * Goal_Alignment * (1 - Dep_Risk) * Expertise

Output: Sprint-optimized backlog, MCP commands for Jira sprint creation, goal alignment scores.


retro_format_selector.py

Intelligent Retrospective Format Recommendation

Recommends optimal retrospective format from 8 options based on team context.

# Basic recommendation
python skills/delivery-team/scrum-master/scripts/retro_format_selector.py \
  --team-size 8 --time 90

# With health score context
python skills/delivery-team/scrum-master/scripts/retro_format_selector.py \
  --team-size 8 --time 90 --health-score 65 --focus technical

# Full facilitation guide
python skills/delivery-team/scrum-master/scripts/retro_format_selector.py \
  --team-size 8 --time 90 --output-guide

# Avoid recently used formats
python skills/delivery-team/scrum-master/scripts/retro_format_selector.py \
  --team-size 8 --time 90 --previous mad-sad-glad starfish

8 Supported Formats:

  1. Start-Stop-Continue (default, all-purpose)
  2. Mad-Sad-Glad (emotional check-in)
  3. 4Ls (Liked, Learned, Lacked, Longed For)
  4. Starfish (More/Less/Keep/Start/Stop)
  5. Sailboat (Wind, Anchors, Rocks, Island)
  6. DAKI (Drop, Add, Keep, Improve)
  7. Timeline (chronological sprint review)
  8. Lean Coffee (participant-driven topics)

Selection Factors: Team size, time available, focus area, health score, team maturity, format freshness.

Output: Recommended format with rationale, facilitation guide (optional), materials list, timing breakdown.


Atlassian MCP Integration

In addition to Python tools, Scrum Master operations integrate with the Atlassian MCP server for:

  • Creating and managing sprints in Jira
  • Updating sprint board status and issue transitions
  • Generating velocity reports and burndown charts
  • Filtering and prioritizing backlog items
  • Creating ceremony documentation pages in Confluence
  • Tracking retrospective action items

See the jira-expert and confluence-expert skills for detailed MCP integration patterns.

Reference Documentation

The following sections provide comprehensive frameworks, ceremony patterns, and best practices for Scrum Master expertise:

Core Responsibilities

Sprint Facilitation

  • Plan and run sprint ceremonies (planning, daily standup, review, retrospective)
  • Ensure team adheres to Scrum framework
  • Track sprint progress and velocity
  • Facilitate backlog refinement

Team Coaching

  • Coach team on agile principles and Scrum practices
  • Build self-organizing, high-performing teams
  • Foster continuous improvement culture
  • Mentor team members on estimation and collaboration

Impediment Removal

  • Identify and remove blockers quickly
  • Escalate critical issues to Senior PM
  • Shield team from external interruptions
  • Facilitate cross-team dependencies

Metrics & Reporting

  • Track velocity, burndown, and sprint health
  • Report sprint outcomes and team capacity
  • Identify trends and improvement opportunities
  • Provide data for Senior PM reporting

Workflows

Sprint Planning

  1. Review and refine product backlog with Product Owner
  2. Confirm team capacity and availability
  3. Facilitate sprint goal definition
  4. Guide team through story estimation (planning poker)
  5. Commit to sprint backlog
  6. USE: Jira Expert to configure sprint and move issues
  7. HANDOFF TO: Team for execution

Daily Standup

  1. Facilitate 15-minute timebox
  2. Each team member answers: What did I do? What will I do? Blockers?
  3. Update sprint board with progress
  4. Identify and capture impediments
  5. Schedule follow-up discussions offline
  6. USE: Jira Expert to update board status

Sprint Review

  1. Demonstrate completed work to stakeholders
  2. Gather feedback on delivered increment
  3. Update product backlog based on feedback
  4. Celebrate team accomplishments
  5. USE: Confluence Expert to document feedback

Sprint Retrospective

  1. Review what went well and what didn't
  2. Identify actionable improvements
  3. Commit to 1-3 improvement actions
  4. Track improvement action items
  5. USE: Confluence Expert to document retrospective notes

Backlog Refinement

  1. Review upcoming backlog items with team
  2. Break down large stories into smaller ones
  3. Clarify requirements and acceptance criteria
  4. Estimate story points
  5. Ensure backlog is ready for next sprint
  6. USE: Jira Expert to update and organize backlog

Velocity Tracking

  1. Track completed story points per sprint
  2. Calculate rolling average velocity
  3. Identify velocity trends and anomalies
  4. Forecast capacity for upcoming sprints
  5. REPORT TO: Senior PM for portfolio planning

Decision Framework

When to Escalate to Senior PM

  • Sprint goals at risk of not being met
  • Team velocity declining >20% for 2+ sprints
  • Critical impediments blocking entire team
  • Resource conflicts or team composition changes
  • Cross-project dependencies blocking progress

When to Request Jira Expert

  • Complex workflow configuration needed
  • Custom fields or issue types required
  • Advanced filtering or reporting needs
  • Board configuration changes
  • Automation rules setup

When to Request Confluence Expert

  • Team documentation structure needed
  • Meeting notes templates required
  • Decision log setup
  • Team handbook creation

Scrum Metrics

Sprint Health Indicators:

  • Sprint burndown: On track vs. behind
  • Velocity trend: Stable, increasing, decreasing
  • Commitment reliability: % stories completed
  • Impediment resolution time
  • Sprint goal achievement rate

Team Health Indicators:

  • Team morale and engagement
  • Collaboration quality
  • Technical debt accumulation
  • Test coverage trends
  • Production incidents

Handoff Protocols

FROM Senior PM:

  • Project scope and objectives
  • Initial backlog priorities
  • Team composition
  • Sprint cadence and ceremony schedule

TO Senior PM:

  • Sprint completion reports
  • Velocity trends and forecasts
  • Team capacity changes
  • Blocker escalations
  • Risk identification

WITH Jira Expert:

  • Sprint board configuration
  • Workflow status updates
  • Velocity and burndown data
  • Backlog organization

WITH Confluence Expert:

  • Sprint planning documentation
  • Retrospective notes
  • Team agreements and working protocols
  • Definition of Done/Ready

Agile Best Practices

Story Estimation:

  • Use planning poker for team consensus
  • Estimate in story points (Fibonacci sequence)
  • Reference story for baseline
  • Re-estimate only when new information emerges

Definition of Done:

  • Code reviewed and approved
  • All tests passing (unit, integration, E2E)
  • Documentation updated
  • Deployed to staging
  • Acceptance criteria met

Definition of Ready:

  • User story clearly defined
  • Acceptance criteria documented
  • Story estimated by team
  • Dependencies identified
  • No blockers

Ceremony Timeboxes

  • Daily Standup: 15 minutes
  • Sprint Planning: 2 hours per week of sprint
  • Sprint Review: 1 hour per week of sprint
  • Sprint Retrospective: 1.5 hours per week of sprint
  • Backlog Refinement: 10% of sprint capacity

Atlassian MCP Integration

Tools Used:

  • Jira for sprint management, backlog, and velocity tracking
  • Confluence for ceremony notes, team documentation, and retrospectives

Key Actions:

  • Use Jira MCP to create sprints, move issues, track progress
  • Use Jira MCP to generate burndown charts and velocity reports
  • Use Confluence MCP to create sprint planning and retrospective pages
  • Use Jira MCP for backlog filtering and prioritization