404: Not Found
estimate-epic-timeline
@semicolon-devteam/semo0
0
Estimate Epic timeline by summing all Draft Tasks points. Use when (1) all Draft Tasks are created with estimation, (2) need to calculate total Epic duration, (3) identifying parallel/sequential tasks and critical path. Posts timeline prediction as Epic comment.
Install Skill
1Download skill
2Enable skills in Claude
Open claude.ai/settings/capabilities and find the "Skills" section
3Upload to Claude
Click "Upload skill" and select the downloaded ZIP file
Note: Please verify skill by going through its instructions before using it.