Plan-first development methodology that creates detailed specifications before coding. Use when building features, refactoring code, or implementing complex changes. Creates structured plans with phases, file-level details, and verification steps to prevent drift and ensure production-ready code.

Install Skill

1Download skill
2Enable skills in Claude

Open claude.ai/settings/capabilities and find the "Skills" section

3Upload to Claude

Click "Upload skill" and select the downloaded ZIP file

Note: Please verify skill by going through its instructions before using it.

SKILL.md

name sdd-plan
description Plan-first development methodology that creates detailed specifications before coding. Use when building features, refactoring code, or implementing complex changes. Creates structured plans with phases, file-level details, and verification steps to prevent drift and ensure production-ready code.

Core Philosophy

Plan First, Code Second: Every development task begins with a detailed specification that acts as a contract between intent and implementation. This prevents the common failure mode where AI "works once and then falls apart" in real codebases.

Staged Planning (Recommended): For complex features, create specifications in two stages: (1) high-level phase structure for user review and approval, then (2) detailed task breakdown. This reduces wasted effort and enables early course correction before detailed planning begins.

Atomic Tasks: Each task represents a single, focused change to one file. Tasks are the fundamental unit of work in SDD, and keeping them atomic provides:

  • Precise dependency tracking: File-level dependencies are explicit and clear
  • Granular progress monitoring: Each completed task represents concrete, verifiable progress
  • Parallel implementation: Independent tasks can be worked on simultaneously
  • Straightforward verification: Each task has a focused scope and clear success criteria
  • Easy rollback: Changes can be reverted at the file level without affecting other work

When a feature requires changes across multiple files, decompose it into multiple tasks with proper dependencies, or use subtasks to organize related file changes under a parent task. Never bundle multiple file changes into a single task. Always practice atomic task decomposition and verification.

Key Benefits:

  • Reduces hallucinated APIs and misread intent
  • Prevents breaking existing functionality
  • Provides clear verification criteria
  • Enables confident iteration
  • Creates auditable development process
  • Early feedback checkpoint reduces rework (staged approach)

When to Use This Skill

Use Skill(sdd-toolkit:sdd-plan) (this skill) for:

  • New features or significant functionality additions
  • Complex refactoring across multiple files
  • API integrations or external service connections
  • Architecture changes or system redesigns
  • Any task where precision and reliability are critical
  • Large codebases where context drift is a risk

Do NOT use for:

  • Simple one-file changes or bug fixes
  • Trivial modifications or formatting changes
  • Exploratory prototyping or spikes
  • Quick experiments or proof-of-concepts
  • Updating existing specs (use Skill(sdd-toolkit:sdd-update))
  • Finding what to work on next (use Skill(sdd-toolkit:sdd-next))
  • Tracking task progress (use Skill(sdd-toolkit:sdd-update))

The Spec-Driven Development Process

Phase 1: Specification Creation

Create a detailed specification document before writing any code.

Start by reading the JSON schema for the JSON you will be generating: Run sdd schema to get the complete spec schema JSON.

This will tell you what fields are required and optional in the specification, and what data types are expected for each field.

1.0 High-Level Phase Planning Stage (Recommended First Step)

Purpose: Before diving into detailed task planning, create a high-level phase structure for user review and approval. This staged approach reduces wasted effort and enables early course correction.

When to Use Staged Planning:

  • Complex features requiring multiple phases (3+ phases expected)
  • Projects where requirements might need adjustment
  • Situations where you want early stakeholder feedback
  • Large refactorings affecting many files

When to Skip to Full Planning:

  • Simple, well-understood tasks (1-2 phases max)
  • Urgent changes where speed is critical
  • When you're highly confident in the approach

Staged Planning Workflow:

  1. Generate Phase-Only Plan (Markdown format for easy review)
  2. User Review & Approval Checkpoint
  3. Generate Detailed Tasks (Complete JSON spec)
1.0.1 Creating the Phase-Only Plan

Generate a concise markdown document outlining just the high-level phases. Do not create detailed tasks yet.

Phase-Only Markdown Template:

# High-Level Plan: [Feature/Change Name]

## Overview
Brief description of what this change accomplishes and why.

## Objectives
- Primary objective
- Secondary objectives
- Success criteria

## Proposed Phases

### Phase 1: [Phase Name]
**Purpose**: What this phase accomplishes
**Dependencies**: What must exist before starting
**Risk Level**: Low/Medium/High
**Key Deliverables**:
- Deliverable 1
- Deliverable 2

**Estimated Files Affected**: 3-5 files
**Estimated Complexity**: Low/Medium/High

### Phase 2: [Phase Name]
[Repeat structure for each phase]

### Phase N: [Phase Name]
[Repeat structure for each phase]

## Implementation Order
1. Phase X (must complete first)
2. Phase Y (depends on X)
3. Phase Z (can run parallel to Y)

## Key Integration Points
- How phases connect to each other
- Critical dependencies between phases
- Potential breaking points or risks

## Questions for Review
- Any specific concerns about this approach?
- Are there phases missing or phases that should be combined?
- Does the order make sense?

Guidelines for Phase Planning:

  • Be concise: Each phase description should be 3-5 sentences max
  • Focus on "what" not "how": Save implementation details for later
  • Identify dependencies: Make phase ordering clear
  • Highlight risks: Call out high-risk phases early
  • Estimate scope: Rough file counts help set expectations
  • Ask questions: Invite feedback on unclear areas
1.0.2 User Review & Approval Checkpoint

Present the phase-only plan to the user and explicitly request approval before proceeding.

Example Interaction Pattern:

AI: "Let me first propose the high-level phase structure for this feature.
    This will help us ensure we're on the right track before diving into
    detailed task planning."

[AI generates phase-only markdown following template above]

AI: "I've outlined 4 phases for implementing user authentication:
    1. Database Schema (foundational)
    2. Auth Service Layer (core logic)
    3. API Integration (connects to app)
    4. Testing & Verification (ensures quality)

    Does this phase structure make sense? Any phases you'd like to add,
    remove, or reorganize before I create the detailed task breakdown?"

[User reviews and responds]

User: "Looks good, but let's add a phase for migration of existing users
       between Phase 2 and 3."

AI: "Great point! I'll add 'Phase 3: User Migration' between Auth Service
    and API Integration. Let me update the plan..."

[AI revises phase structure]

AI: "Updated plan with migration phase. Does this revised structure work?"

User: "Perfect, go ahead with the detailed planning."

AI: "Excellent! Now I'll create the complete specification with detailed
    tasks for each phase..."

[AI proceeds to section 1.1-1.3.2 to generate full JSON spec]

Key Points for This Checkpoint:

  • Explicit approval required: Don't proceed without clear confirmation
  • Invite feedback: Encourage the user to suggest changes
  • Be flexible: Expect iteration on phase structure
  • Summarize changes: Clearly state what you're updating
  • Confirm before proceeding: Get final "go ahead" before detailed work
1.0.3 Benefits of Staged Planning

For Users:

  • Review and redirect early (5 minutes vs 30 minutes)
  • Easier to understand high-level structure
  • Natural checkpoint for collaboration
  • Confidence that detailed work will be on target

For AI:

  • Validated direction before detailed generation
  • Clearer constraints and requirements
  • Reduced rework from misunderstanding
  • Better context for task generation
1.0.4 Proceeding to Detailed Planning

Once the phase structure is approved:

  1. Proceed to section 1.1: Understand the Intent (if not already done)
  2. Continue to section 1.2: Analyze the Codebase
  3. Generate full spec in section 1.3.2: Using approved phases as structure
  4. Reference approval: "Based on the approved phase structure, I'll now create detailed tasks for each phase..."

Important: The approved phase structure should guide your detailed JSON generation. Maintain consistency between what was approved and what you generate.


1.1 Understand the Intent

Begin by deeply understanding what needs to be accomplished:

  • Core objective: What is the primary goal?
  • User perspective: How will users interact with this?
  • Success criteria: What defines "done"?
  • Constraints: What limitations or requirements exist?

1.2 Analyze the Codebase

Before creating the plan, explore the relevant parts of the codebase:

  • Identify existing patterns and conventions
  • Locate related functionality
  • Map dependencies and integration points
  • Review similar implementations for consistency
  • Note potential conflicts or breaking changes

Automatic Documentation Availability Check:

This skill automatically checks if codebase documentation is available to enhance planning quality and speed.

How It Works:

  1. Automatic Check: Before manual codebase exploration, the skill runs sdd doc stats to verify documentation availability
  2. Smart Prompting: If documentation is missing or stale, you'll receive a clear prompt explaining the benefits
  3. User Decision: You can choose to generate documentation now (2-5 minutes) or proceed with manual analysis
  4. Graceful Degradation: If you skip documentation, the skill seamlessly falls back to manual codebase exploration

Value Proposition:

With documentation available, codebase analysis becomes dramatically more effective:

  • Comprehensive Understanding: See the entire codebase structure, patterns, and relationships at a glance
  • Better Specs: Create more accurate plans based on complete knowledge of existing implementations
  • Faster Planning: Reduce analysis time from hours to minutes
  • Consistency: Automatically align new features with existing architectural patterns
  • Future Benefit: Documentation accelerates all subsequent planning and development tasks

When Documentation Is Unavailable:

You'll see a prompt like:

ℹ️  Codebase documentation not found

Documentation enables:
- Comprehensive codebase understanding
- Faster, more accurate planning
- Automatic pattern and dependency discovery

Generate documentation now? (2-5 minutes)
1. Yes, generate for better planning
2. No, use manual codebase exploration

Recommendation: For medium to large codebases or complex features, generating documentation upfront significantly improves spec quality and saves planning time.

Quick Reference: Useful Documentation Commands for Planning

When documentation is available, these commands accelerate codebase analysis and planning:

Recommended Starting Point:

Command Purpose Example Usage
sdd doc scope <module> --plan Get focused planning context for a module (recommended baseline) sdd doc scope src/auth/login.ts --plan

This gives you module summary, complexity analysis, and architectural overview in a single command.

When to Use Existing Commands Instead:

While scope --plan provides comprehensive context, use individual commands when you need focused, specific information:

Use Case Recommended Command When to Choose This
Quick module overview sdd doc describe-module <path> You only need a summary without complexity/dependency details
Complexity-focused analysis sdd doc complexity <file> Planning refactoring or assessing technical debt for a specific file
Dependency mapping sdd doc dependencies <file> Impact analysis or understanding integration points
Reverse dependency check sdd doc dependencies --reverse <file> Breaking change impact assessment

Choose individual commands when:

  • You need targeted information quickly (avoid information overload)
  • Working within strict context limits
  • Performing specific analysis tasks (complexity assessment, impact analysis)
  • Documentation is stale/incomplete and you need just one aspect

Choose scope --plan when:

  • Starting a new feature or major change (comprehensive context needed)
  • Need balanced view of module for task planning
  • Want architectural patterns + complexity + dependencies together

Additional Commands:

Command Purpose Example Usage
sdd doc stats Check documentation status and metrics sdd doc stats
sdd doc search <query> Find relevant implementations and patterns sdd doc search "authentication flow"
sdd doc context <file> Get comprehensive file context and relationships sdd doc context src/auth/login.ts
sdd doc dependencies --reverse <file> Find what depends on a file (impact analysis) sdd doc dependencies --reverse src/models/User.ts
sdd doc complexity <file> Assess code complexity and maintainability sdd doc complexity src/services/payment.ts
sdd doc list-modules Get overview of all modules in the codebase sdd doc list-modules

Common Planning Workflows with Documentation:

  • Understanding existing features: sdd doc search → find similar implementations
  • Impact analysis: sdd doc dependencies --reverse → see what will be affected
  • Complexity assessment: sdd doc complexity → estimate effort and risks
  • Pattern discovery: sdd doc context → understand existing architectural patterns
  • Codebase overview: sdd doc list-modules + sdd doc stats → understand project structure

1.2.1 Using Skill(sdd-toolkit:doc-query) for Efficient Codebase Analysis

Proactive Documentation Generation

Before starting codebase analysis, automatically check if documentation exists. If missing, offer to generate it for faster and more accurate planning.

Auto-Detection Workflow:

  1. Check for existing documentation (fast check):
sdd doc stats
  1. If documentation not found, proactively ask the user:
I notice this codebase doesn't have documentation yet. Would you like me to
generate it? This will enable much faster and more accurate codebase analysis.

Generating documentation will take 2-5 minutes but will speed up all future
planning tasks.

Generate documentation now? [Y/n]
  1. If user agrees, use Task tool to invoke llm-doc-gen subagent for documentation generation:
Task(
  subagent_type: "sdd-toolkit:llm-doc-gen",
  prompt: "Generate codebase documentation",
  description: "Generate docs"
)

Then use Task tool with doc-query subagent for codebase analysis.

  1. If user declines or generation fails, fall back to manual exploration using Explore, or alternatively Glob/Read.

Documentation-First Approach:

  • 10x faster codebase analysis - Seconds vs minutes of manual exploration
  • Better quality specs - Comprehensive understanding of patterns and dependencies
  • Future time savings - Documentation used across all subsequent planning tasks
  • Consistency - Follow existing patterns automatically

Using Existing Documentation:

If codebase documentation has been generated, use Task tool with doc-query subagent to efficiently gather context before planning. This provides structured, comprehensive codebase understanding without manual exploration.

Recommended Analysis Workflow:

The doc-query subagent provides the following capabilities (command examples shown for reference):

Step 1: Get Codebase Overview

# See overall structure and metrics
sdd doc stats

# Example output:
# Total Modules: 37
# Total Classes: 84
# Total Functions: 53
# Average Complexity: 2.42
# Max Complexity: 8

Step 2: Search for Similar Implementations

# Find existing implementations of similar features
sdd doc search "feature-keyword"

# Example: Planning authentication? Search for "auth"
sdd doc search "auth"
# Finds: AuthService, authentication middleware, User model, etc.

Step 3: Gather Feature Area Context

# Get all entities related to feature area
sdd doc context "feature-area"

# Example: Planning user management
sdd doc context "user"
# Returns: All classes, functions, modules related to users

Step 4: Analyze Target Module Complexity

# Identify high-complexity functions in target area
sdd doc complexity --threshold 5 --module target_module.py

# Use to:
# - Identify refactoring needs
# - Plan testing strategy
# - Estimate implementation complexity

Step 5: Map Dependencies and Impact

# Check what a module depends on
sdd doc dependencies app/services/module.py

# Check what depends on it (reverse dependencies - impact analysis)
sdd doc dependencies app/services/module.py --reverse

# Use to:
# - Understand integration points
# - Identify breaking change risks
# - Plan implementation order

Step 6: Find Test Files and Coverage

# Find tests for a module
sdd doc search "test.*module_name"

Integration Example:

When planning "Add JWT Authentication" feature:

# 1. Check docs exist
sdd doc stats

# 2. Search for existing auth
sdd doc search "auth"
# Found: app/middleware/auth.py, app/models/session.py

# 3. Get full auth context
sdd doc context "auth"
# Returns: 4 classes, 3 functions, dependencies

# 4. Check auth middleware dependencies
sdd doc dependencies app/middleware/auth.py --reverse
# Shows: 5 routes depend on this middleware

# 5. Find similar implementations
sdd doc find-class ".*Service.*" --pattern
# Identify service layer patterns to follow

# 6. Check complexity of related code
sdd doc complexity --module auth.py
# Understand existing auth complexity

When codebase documentation has not been generated: Fall back to manual codebase exploration:

  • Use Explore to explore the codebase
  • Use Glob to find files: **/*auth*.py
  • Use Grep to search code: class.*Service
  • Use Read to examine files directly

After Analysis: Use gathered insights to create accurate, well-informed specifications in Phase 1.3.

1.3 Create the Specification Document

NOTE: If you used staged planning (section 1.0), you should now have an approved phase structure. Use that as the foundation for your detailed specification. Maintain consistency with what the user approved.

IMPORTANT: The specification is a JSON file (created in section 1.3.2). The markdown template below is a conceptual planning guide to help you gather and organize information before creating the JSON. You will NOT create this markdown file - it shows what information to plan for.

PLANNING GUIDE (Markdown Template for Information Gathering):

NOTE: This template shows WHAT to plan, not WHAT to create. Use it to organize your thoughts, then proceed to section 1.3.2 to create the actual JSON spec file.

SPECIFICATION TEMPLATE:

# Specification: [Feature/Change Name]

## Overview
Brief description of what this change accomplishes and why.

## Objectives
- Primary objective
- Secondary objectives
- Success criteria

## Phases

### Phase 1: [Phase Name]
**Purpose**: What this phase accomplishes
**Dependencies**: What must exist before starting
**Risk Level**: Low/Medium/High

**Files to Modify:**
- `path/to/file1.ext`
  - **Changes**: Specific modifications needed
  - **Reasoning**: Why these changes are necessary
  - **Integration points**: How this connects to other parts

- `path/to/file2.ext`
  - **Changes**: Specific modifications needed
  - **Reasoning**: Why these changes are necessary
  - **Integration points**: How this connects to other parts

**Verification Steps:**
1. Specific check to perform
2. Expected outcome
3. How to validate correctness

### Phase 2: [Phase Name]
[Repeat structure for each phase]

## Implementation Order
1. Phase X (must complete first)
2. Phase Y (depends on X)
3. Phase Z (can run parallel to Y)

## Verification Checklist
- [ ] All planned files modified
- [ ] No unintended side effects
- [ ] Tests pass
- [ ] Documentation updated
- [ ] No regressions introduced
- [ ] Follows existing patterns
- [ ] Performance acceptable
- [ ] Security considerations addressed

## Rollback Plan
How to revert changes if issues arise.

## Post-Implementation
- Monitoring requirements
- Documentation to update
- Team communication needs

Critical Specification Requirements:

  • File-level detail: Specify EXACTLY which files will be modified
  • Clear reasoning: Every change must have explicit justification
  • Phase ordering: Define clear dependencies between phases
  • Verification criteria: Include specific, testable checks
  • Integration awareness: Note how changes affect other systems

1.3.1 Plan the Task Hierarchy (Visualization Guide)

IMPORTANT: This section shows hierarchy notation for PLANNING and VISUALIZATION only. You will NOT create files in this format. This is a way to conceptualize the structure before creating the JSON in section 1.3.2.

Use this notation to plan your hierarchy, then translate it into JSON structure in section 1.3.2.

Hierarchy Levels:

  1. [Spec] - Root of entire specification
  2. [Phase] - Major implementation phase from spec
  3. [Group] - Container for related tasks ("File Modifications", "Verifications")
  4. [Task] - Individual file modification or logical unit
  5. [Subtask] - Specific change within a file
  6. [Verify] - Verification step (automated or manual)

Format Requirements:

Spec Level (root of everything):

[Spec] Feature Name (0/total tasks, 0%) {#spec-root}
  • Always uses ID {#spec-root}
  • Shows total task count across all phases
  • Initial progress always 0%

Phase Level (major implementation stages):

[Phase] Phase Name (0/phase_task_count tasks) {#phase-N}
  • Sequential numbering: phase-1, phase-2, etc.
  • Task count only for this phase
  • All phases start as [pending]

Group Level (task containers within phase):

[Group] File Modifications (0/group_task_count tasks) {#phase-N-files}
[Group] Verification (0/verify_task_count tasks) {#phase-N-verify}
  • Two standard groups per phase: -files and -verify
  • Additional phase-specific groups (e.g., {#phase-1-investigation}) are allowed when useful—keep IDs in the phase-N-* format
  • File modifications group typically comes first
  • Verification group is usually blocked by the primary work groups

Task Level (individual work units):

[Task] path/to/file.ext [pending] {#task-N-M}
[Task] path/to/file.ext [pending] [depends: task-X-Y] {#task-N-M}
[Task] path/to/file.ext [pending] [blocked-by: task-X-Y] {#task-N-M}
[Task] path/to/file.ext [pending] [parallel-safe] {#task-N-M}
  • One task per file or logical unit
  • N = phase number, M = task number within phase
  • Dependency markers optional but important

Subtask Level (granular steps):

[Subtask] Specific change description [pending] {#task-N-M-P}
  • P = subtask number
  • Use when task needs breakdown
  • Each should be < 30 minutes

Verification Level (validation steps):

[Verify] What to check [pending] [auto] {#verify-N-M}
[Verify] What to check [pending] [manual] {#verify-N-M}
[Verify] What to check [pending] [fidelity] {#verify-N-M}
  • Mark as [auto] if can be scripted (e.g., running tests)
  • Mark as [manual] if requires human judgment (e.g., code review checklist)
  • Mark as [fidelity] for implementation-vs-spec comparison (uses sdd-fidelity-review skill)
  • Include command for automated checks
  • Include skill/scope/target metadata for fidelity checks

Example Hierarchy:

[Spec] User Authentication (0/23 tasks, 0%) {#spec-root}
│
├─ [Phase] Database Schema (0/7 tasks) {#phase-1}
│   │
│   ├─ [Group] File Modifications (0/3 tasks) {#phase-1-files}
│   │   │
│   │   ├─ [Task] db/migrations/001_add_users.sql [pending] {#task-1-1}
│   │   │   ├─ [Subtask] Create users table [pending] {#task-1-1-1}
│   │   │   ├─ [Subtask] Add constraints [pending] {#task-1-1-2}
│   │   │   └─ [Subtask] Create indexes [pending] {#task-1-1-3}
│   │   │
│   │   ├─ [Task] src/models/User.ts [pending] [depends: task-1-1] {#task-1-2}
│   │   │   └─ [Subtask] Define interface [pending] {#task-1-2-1}
│   │   │
│   │   └─ [Task] src/types/index.ts [pending] [parallel-safe] {#task-1-3}
│   │       └─ [Subtask] Export User type [pending] {#task-1-3-1}
│   │
│   └─ [Group] Verification [blocked-by: phase-1-files] (0/5 tasks) {#phase-1-verify}
│       ├─ [Verify] Migration runs [pending] [auto] {#verify-1-1}
│       │   └─ Command: `npm run migrate`
│       ├─ [Verify] Model imports [pending] [auto] {#verify-1-2}
│       ├─ [Verify] Tests pass [pending] [auto] {#verify-1-3}
│       │   └─ Command: `npm test -- user.spec.ts`
│       ├─ [Verify] Implementation fidelity [pending] [fidelity] {#verify-1-4}
│       │   └─ Skill: sdd-fidelity-review
│       │   └─ Scope: phase
│       │   └─ Target: phase-1
│       └─ [Verify] Validation works [pending] [manual] {#verify-1-5}

Verification Steps:

  • Group all verifications together (separate from file modifications)
  • One verification per test/check
  • Include command/steps for automated verifications
  • Mark manual verifications clearly
  • Add fidelity reviews at phase boundaries to ensure implementation matches spec

Rule of Thumb:

  • Each task/subtask should be completable in < 30 minutes
  • If estimating > 30 minutes, break into subtasks
  • Verification tasks can be longer (might include multiple test runs)

Dependency Tracking

Dependency Types:

Hard Dependencies ([blocked-by: task-id]):

  • Cannot start until dependency completes
  • Used for sequential requirements
  • Example: Can't write tests until model is created
[Task] tests/user.spec.ts [pending] [blocked-by: task-1-2] {#task-1-4}

Soft Dependencies ([depends: task-id]):

  • Recommended order but not strictly required
  • Used for logical sequencing
  • Example: Should implement helper before service, but not required
[Task] src/services/auth.ts [pending] [depends: task-1-2] {#task-2-1}

Blocks ([blocks: task-id]):

  • Explicit marker that this task blocks others
  • Usually redundant with blocked-by but helps navigation
  • Used sparingly for critical path items

Parallel-Safe ([parallel-safe]):

  • Can be done in any order
  • No dependencies on other tasks
  • Can be implemented simultaneously
[Task] src/types/index.ts [pending] [parallel-safe] {#task-1-3}

Phase Dependencies:

  • Phases are sequential by default
  • Later phases blocked by earlier phases
  • Make this explicit in hierarchy:
[Phase] Auth Service [blocked-by: phase-1] (0/8 tasks) {#phase-2}

Progress Indicators

Multi-Level Progress Tracking:

Show progress at every level of hierarchy:

[Spec] Feature (0/23 tasks, 0%) {#spec-root}
└─ [Phase] Setup [pending] (0/7 tasks, 0%) {#phase-1}
    └─ [Group] File Modifications (0/3 tasks, 0%) {#phase-1-files}

Progress Calculation (At Creation Time):

  • All tasks start at [pending]
  • All progress percentages are 0%
  • Task counts come from spec structure
  • Progress format: (completed/total tasks, percentage%)

Status Values (At Creation):

  • [pending] - All tasks initially pending
  • No tasks marked as in_progress, completed, or blocked at creation
  • Implementation status tracking happens later via sdd-update

Display Format:

  • Spec level: Total task count and percentage
  • Phase level: Task count for that phase
  • Group level: Task count for that group
  • Individual tasks: Status only, no count

Automatic Task Count Calculation:

You don't need to manually calculate task counts - the sdd-validate subagent can fix this automatically:

# Preview fixes without applying (recommended first step)
Task(
  subagent_type: "sdd-toolkit:sdd-validate-subagent",
  prompt: "Preview auto-fixes for specs/pending/your-spec.json. Show what would be changed without applying.",
  description: "Preview task count fixes"
)

# Apply fixes to task counts and hierarchy integrity
Task(
  subagent_type: "sdd-toolkit:sdd-validate-subagent",
  prompt: "Auto-fix specs/pending/your-spec.json. Apply all fixable issues.",
  description: "Apply task count fixes"
)

How it works:

  • Uses recalculate_progress() from sdd_common/progress.py
  • Recursively calculates counts from leaf nodes up through hierarchy
  • Leaf nodes (individual tasks/subtasks) = 1 task each
  • Parent nodes sum their children's counts
  • Ensures counts stay synchronized as spec evolves

When to use:

  • After adding/removing tasks from JSON hierarchy
  • When validation reports count mismatches
  • Before running sdd-next (ensures accurate counts)
  • Any time counts seem out of sync

Common pitfall: Don't manually update total_tasks or completed_tasks in the JSON - let the sdd-validate subagent or sdd-update handle it automatically to avoid arithmetic errors.

Task ID Format

Hierarchical ID Structure:

  • Spec: {#spec-root}
  • Phase: {#phase-N}
  • Group: {#phase-N-files} or {#phase-N-verify}
  • Task: {#task-N-M} (phase number, task number)
  • Subtask: {#task-N-M-P} (includes subtask number)
  • Verification: {#verify-N-M}

Examples:

{#spec-root}          - Root spec
{#phase-1}            - Phase 1
{#phase-1-files}      - Phase 1 file modifications group
{#task-1-1}           - Phase 1, task 1
{#task-1-1-1}         - Phase 1, task 1, subtask 1
{#phase-1-verify}     - Phase 1 verification group
{#verify-1-1}         - Phase 1, verification 1

ID Stability:

  • IDs assigned at creation time
  • Remain stable during refinement if possible
  • If structure changes significantly, regenerate with new IDs
  • Never reuse IDs within same spec

1.3.2 Create the JSON Spec File (Single Source of Truth)

THIS IS THE ACTUAL SPEC FILE YOU WILL CREATE. After planning your structure using the guides in sections 1.3 and 1.3.1, now create the JSON file that will be used by sdd-next, sdd-update, and all other SDD tools.

If you completed staged planning (section 1.0): Base your JSON hierarchy on the approved phase structure. The phase names, ordering, and dependencies should match what the user approved. Now you're adding the detailed task breakdown within each phase.

Note: Generate this JSON file manually following the structure described below.

Location: specs/pending/{spec-id}.json

Initial Spec File Structure:

{
  "spec_id": "user-auth-2025-10-18-001",
  "generated": "2025-10-18T10:00:00Z",
  "last_updated": "2025-10-18T10:00:00Z",

  "hierarchy": {
    "spec-root": {
      "type": "spec",
      "title": "User Authentication",
      "status": "pending",
      "parent": null,
      "children": ["phase-1", "phase-2", "phase-3"],
      "total_tasks": 24,
      "completed_tasks": 0,
      "metadata": {}
    },

    "phase-1": {
      "type": "phase",
      "title": "Database Schema",
      "status": "pending",
      "parent": "spec-root",
      "children": ["phase-1-files", "phase-1-verify"],
      "total_tasks": 8,
      "completed_tasks": 0,
      "metadata": {}
    },

    "phase-1-files": {
      "type": "group",
      "title": "File Modifications",
      "status": "pending",
      "parent": "phase-1",
      "children": ["task-1-0", "task-1-1", "task-1-2", "task-1-3"],
      "total_tasks": 4,
      "completed_tasks": 0,
      "metadata": {}
    },

    "task-1-0": {
      "type": "task",
      "title": "Analyze existing user data schema",
      "status": "pending",
      "parent": "phase-1-files",
      "children": [],
      "dependencies": {
        "blocks": ["task-1-1"],
        "blocked_by": [],
        "depends": []
      },
      "total_tasks": 1,
      "completed_tasks": 0,
      "metadata": {
        "task_category": "investigation",
        "estimated_hours": 2
      }
    },

    "task-1-1": {
      "type": "task",
      "title": "db/migrations/001_add_users.sql",
      "status": "pending",
      "parent": "phase-1-files",
      "children": ["task-1-1-1", "task-1-1-2", "task-1-1-3"],
      "dependencies": {
        "blocks": [],
        "blocked_by": ["task-1-0"],
        "depends": []
      },
      "total_tasks": 3,
      "completed_tasks": 0,
      "metadata": {
        "file_path": "db/migrations/001_add_users.sql",
        "estimated_hours": 1,
        "task_category": "implementation"
      }
    },

    "task-1-1-1": {
      "type": "subtask",
      "title": "Create users table",
      "status": "pending",
      "parent": "task-1-1",
      "children": [],
      "dependencies": {
        "blocks": [],
        "blocked_by": [],
        "depends": []
      },
      "total_tasks": 1,
      "completed_tasks": 0,
      "metadata": {}
    },

    "phase-1-verify": {
      "type": "group",
      "title": "Verification",
      "status": "pending",
      "parent": "phase-1",
      "children": ["verify-1-1", "verify-1-2"],
      "dependencies": {
        "blocks": [],
        "blocked_by": ["phase-1-files"],
        "depends": []
      },
      "total_tasks": 2,
      "completed_tasks": 0,
      "metadata": {}
    },

    "verify-1-1": {
      "type": "verify",
      "title": "Migration runs without errors",
      "status": "pending",
      "parent": "phase-1-verify",
      "children": [],
      "dependencies": {
        "blocks": [],
        "blocked_by": [],
        "depends": []
      },
      "total_tasks": 1,
      "completed_tasks": 0,
      "metadata": {
        "verification_type": "auto",
        "command": "npm run migrate",
        "expected": "Migration completes successfully"
      }
    },

    "verify-1-2": {
      "type": "verify",
      "title": "Phase 1 implementation fidelity review",
      "status": "pending",
      "parent": "phase-1-verify",
      "children": [],
      "dependencies": {
        "blocks": [],
        "blocked_by": [],
        "depends": []
      },
      "total_tasks": 1,
      "completed_tasks": 0,
      "metadata": {
        "verification_type": "fidelity",
        "skill": "sdd-fidelity-review",
        "scope": "phase",
        "target": "phase-1",
        "on_failure": {
          "consult": true,
          "revert_status": "in_progress",
          "continue_on_failure": false
        }
      }
    }
  }
}

Spec File Generation Rules:

  1. Every node in the hierarchy becomes an entry
  2. All statuses initially "pending"
  3. All completed_tasks initially 0
  4. Parent-child relationships must be bidirectional
  5. Include dependency objects when a node blocks or depends on others (omit when no relationships exist)
  6. Metadata should include file_path for tasks that target specific files (strongly recommended for implementation/refactoring work)
  7. Metadata should include task_category to classify work type (optional but recommended)
  8. Generated and last_updated timestamps at root
  9. spec_id must follow {feature}-{YYYY-MM-DD}-{nnn} (three-digit sequence) to satisfy schema validation

Critical:

  • JSON spec file is the single source of truth
  • Updated by sdd-update, not this skill
  • Read by sdd-next to find next tasks
  • Store in specs/pending/ (new specs), specs/active/ (in progress), specs/completed/, or specs/archived/
  • Consider adding to .gitignore (user preference)
  • Human-readable views can be generated on-demand using sdd render

Task Category Metadata

Tasks should include a task_category field in their metadata to classify the type of work being performed. This helps with task planning, time estimation, and workflow optimization.

Available Categories:

  • investigation: Exploring or analyzing existing code to understand behavior, trace bugs, or map dependencies
  • implementation: Writing new functionality, features, or code that adds capabilities
  • refactoring: Improving code structure, organization, or quality without changing external behavior
  • decision: Architectural or design choices requiring analysis, comparison, or selection between alternatives
  • research: Gathering information, reading documentation, exploring external libraries, or learning new technologies

Category Selection Guidelines:

Category When to Use Typical Duration Needs file_path?
investigation Need to understand existing code before making changes Short-Medium No (optional)
implementation Creating new files, adding features, writing new code Medium-Long Yes (strongly recommended)
refactoring Reorganizing existing code without changing behavior Medium Yes (strongly recommended)
decision Need to choose between approaches or make architectural decisions Short No
research Learning about external tools, reading specs, exploring patterns Short-Medium No

Examples:

// Investigation task - analyzing existing code
{
  "task-1-1": {
    "type": "subtask",
    "title": "Analyze current authentication flow",
    "status": "pending",
    "parent": "phase-1",
    "children": [],
    "metadata": {
      "task_category": "investigation",
      "estimated_hours": 2
    }
  }
}

// Implementation task - writing new functionality
{
  "task-2-1": {
    "type": "task",
    "title": "src/services/authService.ts",
    "status": "pending",
    "parent": "phase-2-files",
    "children": [],
    "metadata": {
      "file_path": "src/services/authService.ts",
      "task_category": "implementation",
      "estimated_hours": 4
    }
  }
}

// Refactoring task - improving code structure
{
  "task-3-1": {
    "type": "task",
    "title": "Extract validation logic to utility module",
    "status": "pending",
    "parent": "phase-3-files",
    "children": [],
    "metadata": {
      "file_path": "src/utils/validation.ts",
      "task_category": "refactoring",
      "estimated_hours": 3
    }
  }
}

// Decision task - architectural choice
{
  "task-1-2": {
    "type": "subtask",
    "title": "Choose between JWT vs session-based authentication",
    "status": "pending",
    "parent": "phase-1",
    "children": [],
    "metadata": {
      "task_category": "decision",
      "estimated_hours": 1
    }
  }
}

// Research task - external learning
{
  "task-1-3": {
    "type": "subtask",
    "title": "Review OAuth 2.0 best practices and security guidelines",
    "status": "pending",
    "parent": "phase-1",
    "children": [],
    "metadata": {
      "task_category": "research",
      "estimated_hours": 2
    }
  }
}

Verification Task Metadata

When creating verification tasks with automated execution:

{
  "verify-1-1": {
    "type": "verify",
    "metadata": {
      "verification_type": "auto",
      "agent": "run-tests",
      "command": "npm test"
    }
  },
  "verify-1-2": {
    "type": "verify",
    "metadata": {
      "verification_type": "fidelity",
      "agent": "sdd-fidelity-review",
      "scope": "phase",
      "target": "phase-1"
    }
  }
}

Important:

  • Use the "agent" field (base agent name) whenever the verification will be run by an automation tool; purely manual checks can omit it
  • Supported automation agent values today: "run-tests", "sdd-fidelity-review"
  • When agent is provided, the system invokes automation via Task(subagent_type: "sdd-toolkit:{skill-name}-subagent")

Setting Default Category (CLI):

When creating specs via the CLI, you can set a default category that will be stored in the spec metadata:

# Create spec with explicit default category
sdd create "User Authentication" --template medium --category investigation

# Create spec without default category
sdd create "User Authentication" --template medium

The --category flag is useful when most tasks in a spec will be the same type (e.g., an investigation-heavy spec or a refactoring-focused spec).

Best Practices:

Choosing the Right Category:

  • Use investigation when you need to understand existing code, trace dependencies, or analyze current behavior before making changes
  • Use implementation when creating new functionality, adding features, or writing new code files
  • Use refactoring when improving code structure without changing external behavior (e.g., extracting functions, renaming variables)
  • Use decision when you need to evaluate alternatives or make architectural choices (often early in phases)
  • Use research when gathering external information, reading documentation, or learning about libraries/tools

Task Ordering:

  • Always use investigation before implementation: Understanding code first prevents mistakes and reduces rework
  • Place decision and research tasks early in phases: These inform later implementation work
  • Group refactoring separately from implementation: Keep behavioral changes distinct from structural improvements
  • Combine decision with research: Research tasks often provide the information needed for decision tasks

Mixed-Type Phases:

  • Phases often contain multiple task categories (investigation → decision → implementation → verification)
  • Start phases with investigation/research tasks to gather context
  • Place decision tasks after investigation but before implementation
  • End phases with verification tasks to validate the work
  • Use dependencies to enforce proper ordering between different category types

Other Guidelines:

  • Always specify category for tasks: Helps with accurate time estimation and resource planning
  • Optional for subtasks: If a subtask's category is obvious from its parent, it can be omitted
  • Add file_path for implementation/refactoring tasks whenever a single file is the focus: This keeps downstream tools precise without blocking broader refactors
  • Skip file_path for investigation/decision/research: These categories often span multiple files or are conceptual

Phase 2: Spec Validation

After creating a JSON specification, validate it to ensure correct format and sdd-next compatibility.

About Validation:

The JSON spec file is validated for:

  • Hierarchy integrity and consistency
  • Task count accuracy
  • Dependency graph validity
  • Required field presence
  • Proper node relationships

Validation is JSON-only - markdown files are optional generated artifacts, not validated.

Using the sdd-validate Subagent:

To validate specs within Claude Code, invoke the sdd-validate subagent using the Task tool:

Task(
  subagent_type: "sdd-toolkit:sdd-validate-subagent",
  prompt: "Validate the spec at specs/pending/your-spec.json. Check for structural errors, missing fields, and dependency issues.",
  description: "Validate spec file"
)

When to invoke the subagent:

  • After creating a new spec (verify initial structure)
  • Before implementation begins (ensure spec is valid)
  • After manual JSON edits (check for errors)
  • When validation errors are suspected (diagnose issues)

2.1 Using the sdd-validate Subagent

The sdd-validate subagent provides validation, reporting, fixing, and statistics operations for spec files.

Core Operations:

  • validate – Validate JSON spec structure and integrity
  • report – Generate detailed analysis with actionable guidance
  • fix – Preview/apply auto-fixes for common hierarchy and metadata issues
  • stats – Summarize hierarchy size, verification coverage, and complexity metrics
Validate Operation (Recommended)

Validates the JSON spec file structure, hierarchy, and integrity.

Invocation:

Task(
  subagent_type: "sdd-toolkit:sdd-validate-subagent",
  prompt: "Validate the spec at specs/pending/your-spec.json. Check for structural errors, missing fields, and dependency issues.",
  description: "Validate spec file"
)
Report Operation

Produces in-depth analysis, grouped by severity, with suggested remedies.

Invocation:

Task(
  subagent_type: "sdd-toolkit:sdd-validate-subagent",
  prompt: "Generate a detailed validation report for specs/pending/your-spec.json. Save the report to specs/reports/your-spec.md.",
  description: "Generate validation report"
)
Fix Operation

Automatically fixes common JSON spec issues. Preview before applying.

Invocation for preview:

Task(
  subagent_type: "sdd-toolkit:sdd-validate-subagent",
  prompt: "Preview auto-fixes for specs/pending/your-spec.json. Show what would be changed without applying.",
  description: "Preview spec fixes"
)

Invocation to apply fixes:

Task(
  subagent_type: "sdd-toolkit:sdd-validate-subagent",
  prompt: "Auto-fix specs/pending/your-spec.json. Apply all fixable issues and validate afterward.",
  description: "Apply spec fixes"
)
Stats Operation (Optional)

Summarizes hierarchy composition, depth, and verification footprint.

Invocation:

Task(
  subagent_type: "sdd-toolkit:sdd-validate-subagent",
  prompt: "Generate comprehensive statistics for specs/pending/your-spec.json. Include quality score, progress metrics, and completeness analysis.",
  description: "Generate spec statistics"
)

Note: JSON remains the source of truth. Markdown reports generated via the subagent are helpful for review, but edits must be made in the JSON and re-rendered.

2.2 Validation Checklist

Before sdd-next Usage:

Invoke the sdd-validate subagent to ensure the JSON spec file is properly formatted:

Task(
  subagent_type: "sdd-toolkit:sdd-validate-subagent",
  prompt: "Validate the spec at specs/pending/your-spec.json. Check for structural errors, missing fields, and dependency issues.",
  description: "Validate spec before implementation"
)

Required for sdd-next:

  • ✅ All errors must be fixed
  • ✅ Hierarchy integrity maintained
  • ✅ Task counts are accurate across hierarchy
  • ✅ All required fields present
  • ✅ Dependencies are valid

If Validation Fails:

Error Type Solution
Task count mismatch Use auto-fix via subagent or regenerate spec file manually
Hierarchy integrity issues Use auto-fix via subagent or check parent/child references manually
Missing required fields Add missing fields, then re-validate with subagent
Invalid dependencies Check dependency IDs match actual task IDs
Circular dependencies Remove or adjust blocking relationships

Auto-Fix Workflow:

If validation fails with fixable errors, use the sdd-validate subagent to preview and apply fixes:

Step 1: Preview fixes

Task(
  subagent_type: "sdd-toolkit:sdd-validate-subagent",
  prompt: "Preview auto-fixes for specs/pending/your-spec.json. Show what would be changed without applying.",
  description: "Preview fixes"
)

Step 2: Apply fixes if preview looks good

Task(
  subagent_type: "sdd-toolkit:sdd-validate-subagent",
  prompt: "Auto-fix specs/pending/your-spec.json. Apply all fixable issues and validate afterward.",
  description: "Apply fixes"
)

Step 3: Validation confirmation The subagent will automatically re-validate after applying fixes and report the results.

Best Practices

Specification Quality

  • Be specific: "Add error handling to API calls" not "improve error handling"
  • Include examples: Show what the change looks like in context
  • Think ahead: Consider maintenance, testing, and documentation needs
  • Stay grounded: Base plans on actual codebase exploration, not assumptions

Common Pitfalls to Avoid

Skipping codebase analysis: Don't guess at file locations or patterns ❌ Vague specifications: "Improve performance" is not actionable ❌ Premature optimization: Don't add features not in the spec ❌ Verification shortcuts: Every step matters, don't skip any ❌ Spec drift: Keep spec updated if requirements change ❌ Over-engineering: Match complexity to actual requirements

Quick Reference

Short task (<5 files, simple changes)

  • Phases: 1-2 phases maximum
  • Hierarchy depth: 2-3 levels (spec → phase → task, minimal subtasks)
  • Task count: 3-8 tasks total
  • Verification: 1-2 verifications per phase (minimum 20% coverage)
  • Spec structure: Brief objectives, files, key changes, basic verification
  • Focus: Verification to prevent breaks, keep hierarchy flat

Medium task (5-15 files, moderate complexity)

  • Phases: 2-4 phases with clear dependencies
  • Hierarchy depth: 3-4 levels (spec → phase → group → task → subtask)
  • Task count: 10-25 tasks with selective subtask breakdown
  • Verification: 2-4 verifications per phase (aim for 30-40% coverage)
  • Spec structure: Full specification with detailed file-level planning
  • Focus: Risk assessment, comprehensive verification steps, dependency tracking

Large task (>15 files or high complexity)

  • Phases: 4-6 phases (if more, split into multiple specs)
  • Hierarchy depth: 4-5 levels maximum (deeper = harder to manage)
  • Task count: 25-50 tasks (>50 suggests splitting into multiple specs)
  • Verification: 3-5 verifications per phase (target 40-50% coverage)
  • Spec structure: Detailed multi-phase with extensive verification and rollback planning
  • Focus: Consider splitting if >6 phases or >50 tasks; higher user involvement in refinement

Rule of thumb: If hierarchy exceeds 5 levels or a single phase has >15 tasks, reorganize or split the spec.